X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404141606002

Well Details

Well ID: 0404141606002
Loading map...
Location: 00/06-16-040-14W4/2
Location Alias: 00/06-16-40-14 W4M
Location Alias 2: 00/06-16-040-14 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 14
Section: 16
County/Municipality: County of Paintearth No. 18
Well Name: SOC PROVOST 6-16-40-14
Operator Name: AlphaBow Energy Ltd.
License Number: 0178035
License Date: 1995-05-19
License Status: Suspension
Spud Date: 1995-07-03
Final Drill Date: 1995-07-07
Well Total Depth: 1172.00 m
Surface Hole Latitude: 52.437548
Surface Hole Longitude: -111.962151

For data sources see[1][2]

Well History

Date Event
1995-05-19 Obtained License
1995-07-04 Direction Drilling Operation Performed - Deviate
1995-07-04 Surface Casing Operation Performed
1995-07-07 Finished Drilling
1995-07-07 Well Log Performed
1995-07-07 Well Mode changed to Drilled and Cased
1995-07-08 Production Casing Operation Performed
1995-07-08 Rig Released
1995-07-22 Perforation Treatment Performed - Jet Perforation
1995-08-25 Well Log Performed
1996-01-16 Perforation Treatment Performed - Jet Perforation
2005-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-23 Perforation Treatment Performed - Jet Perforation
2005-07-23 Plug Back Performed
2005-08-02 Perforation Treatment Performed - Fractured
2006-07-17 Well Began Production
2006-07-17 Well Fluid changed to Gas
2006-07-17 Well Mode changed to Flowing
2014-03-01 Well Fluid changed to Gas
2014-03-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-07-04 204.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-07-22 Perforation 1088.50 1090.00 13
1996-01-16 Perforation 1069.00 1070.00 13
2005-07-22 Packing Device Capped w/Cement 1077.00 1085.00 0
2005-07-23 Packing Device Capped w/Cement 1060.00 1068.00 0
2005-07-23 Perforation 908.50 910.00 17
2005-08-02 Fracture 908.50 910.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4029 0.0 0.0 0.0
2007 8718 0.0 0.0 0.0
2008 8733 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8756 0.0 0.0 0.0
2011 8722 0.0 0.0 0.0
2012 8645 0.0 0.0 0.0
2013 2062 0.0 0.0 0.0

For data sources see[6]

References