X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404141707002

Well Details

Well ID: 0404141707002
Loading map...
Location: 00/07-17-040-14W4/2
Location Alias: 00/07-17-40-14 W4M
Location Alias 2: 00/07-17-040-14 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 14
Section: 17
County/Municipality: County of Paintearth No. 18
Well Name: SOC PROVOST 7-17-40-14
Operator Name: AlphaBow Energy Ltd.
License Number: 0219300
License Date: 1998-12-03
License Status: Suspension
Spud Date: 1998-12-09
Final Drill Date: 1998-12-16
Well Total Depth: 1124.00 m
Surface Hole Latitude: 52.438779
Surface Hole Longitude: -111.985670

For data sources see[1][2]

Well History

Date Event
1998-12-03 Obtained License
1998-12-10 Surface Casing Operation Performed
1998-12-15 Direction Drilling Operation Performed - Deviate
1998-12-16 Finished Drilling
1998-12-16 Well Log Performed
1998-12-16 Well Mode changed to Drilled and Cased
1998-12-17 Production Casing Operation Performed
1998-12-17 Rig Released
1998-12-29 Perforation Treatment Performed - Jet Perforation
1998-12-29 Well Log Performed
1999-01-06 Well Log Performed
2000-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-13 Plug Back Performed
2000-10-16 Perforation Treatment Performed - Jet Perforation
2000-10-16 Well Mode changed to Drilled and Cased
2000-10-17 Well Log Performed
2000-10-27 Well Began Production
2000-10-27 Well Fluid changed to Gas
2000-10-27 Well Mode changed to Flowing
2002-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-24 Plug Back Performed
2002-10-24 Well Fluid changed to Gas
2002-10-24 Well Mode changed to Abandoned Zone
2002-11-01 Perforation Treatment Performed - Jet Perforation
2002-11-02 Well Log Performed
2008-07-23 Perforation Treatment Performed - Fractured
2008-07-23 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-12-15 250.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-12-29 Perforation 1051.80 1052.80 14
2000-10-13 Packing Device Capped w/Cement 1037.00 1045.00 0
2000-10-16 Perforation 1020.00 1021.00 17
2002-10-24 Packing Device Capped w/Cement 1003.50 1011.50 0
2002-11-01 Perforation 877.00 883.00 20
2008-07-23 Perforation 884.50 885.50 17
2008-07-23 Fracture 877.00 885.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1535 0.0 0.0 0.0
2001 2756 0.0 0.0 0.0

For data sources see[6]

References