X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404151816002

Well Details

Well ID: 0404151816002
Loading map...
Location: 00/16-18-040-15W4/2
Location Alias: 00/16-18-40-15 W4M
Location Alias 2: 00/16-18-040-15 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 15
Section: 18
County/Municipality: County of Paintearth No. 18
Well Name: SOC GALAHAD 16-18-40-15
Operator Name: AlphaBow Energy Ltd.
License Number: 0159674
License Date: 1993-07-12
License Status: Abandoned
Spud Date: 1993-07-19
Final Drill Date: 1993-07-28
Well Total Depth: 1235.00 m
Surface Hole Latitude: 52.449008
Surface Hole Longitude: -112.144724

For data sources see[1][2]

Well History

Date Event
1993-07-12 Obtained License
1993-07-19 Well Log Performed
1993-07-22 Lost Circulation Occurred
1993-07-23 Direction Drilling Operation Performed - Deviate
1993-07-28 Finished Drilling
1993-07-28 Well Log Performed
1993-07-28 Well Mode changed to Drilled and Cased
1993-07-29 Drill Stem Test Performed
1993-07-30 Rig Released
1993-07-30 Well Log Performed
1993-09-22 Surface Casing Operation Performed
1993-09-30 Production Casing Operation Performed
1997-07-30 Perforation Treatment Performed - Jet Perforation
1997-07-31 Perforation Treatment Performed - Jet Perforation
1998-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-24 Plug Back Performed
1998-08-25 Perforation Treatment Performed - Jet Perforation
1998-08-25 Well Mode changed to Drilled and Cased
1998-09-01 Well Began Production
1998-09-01 Well Fluid changed to Gas
1998-09-01 Well Mode changed to Flowing
2001-01-01 Well Fluid changed to Gas
2001-01-01 Well Mode changed to Pumping
2010-03-24 Well Fluid changed to Gas
2010-03-24 Well Mode changed to Suspended
2015-03-04 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2015-03-04 Well Log Performed
2015-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-04-20 Perforation Treatment Performed - Jet Perforation
2015-04-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-04-21 Perforation Treatment Performed - Remedial Casing
2015-04-21 Plug Back Performed
2015-04-21 Well Fluid changed to Gas
2015-04-21 Well Mode changed to Abandoned Zone
2020-01-23 Well Abandoned
2020-01-23 Well Fluid changed to Gas
2020-01-23 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-07-23 200.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-07-30 Perforation 1143.50 1145.00 13
2015-04-21 Packing Device Capped w/Cement 265.60 288.90 0
1997-07-31 Perforation 1145.50 1147.00 13
1998-08-24 Packing Device Capped w/Cement 1139.00 1142.00 0
1998-08-25 Perforation 1127.50 1128.50 13
1998-08-25 Perforation 1135.00 1136.00 13
2015-03-04 Packing Dev Cpd w/Res-Gyp Cem 1131.00 1134.00 0
2015-03-05 Packing Device Capped w/Cement 1112.00 1120.00 0
2015-04-20 Perforation 293.00 295.00 17
2015-04-21 Remedial Casing Cementing 293.00 295.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2825 0.0 0.0 0.0
1999 8700 0.0 0.0 0.0
2000 8387 0.0 0.0 0.0
2001 6530 0.0 0.0 0.0
2002 2146 0.0 0.0 0.0
2004 55 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-07-22 Lost Circulation 7.00 88.00
2015-04-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References