If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0404152107000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.45514,"lon":-112.100057,"icon":""}]} |
| Location: 00/07-21-040-15W4/0 | |
| Location Alias: 00/07-21-40-15 W4M | |
| Location Alias 2: 00/07-21-040-15 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 040 | |
| Meridian: 4 | |
| Range: 15 | |
| Section: 21 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: ARS GALAHAD 7-21-40-15 | |
| Operator Name: Prairie Provident Resources Canada Ltd. | |
| License Number: 0169769 | |
| License Date: 1994-08-22 | |
| License Status: Issued | |
| Spud Date: 1994-09-24 | |
| Final Drill Date: 1994-09-28 | |
| Well Total Depth: 1146.00 m | |
| Surface Hole Latitude: 52.455140 | |
| Surface Hole Longitude: -112.100057 |
| Date | Event |
|---|---|
| 1994-08-22 | Obtained License |
| 1994-09-25 | Direction Drilling Operation Performed - Deviate |
| 1994-09-25 | Surface Casing Operation Performed |
| 1994-09-28 | Finished Drilling |
| 1994-09-28 | Well Log Performed |
| 1994-09-28 | Well Mode changed to Drilled and Cased |
| 1994-10-01 | Production Casing Operation Performed |
| 1994-10-01 | Rig Released |
| 1994-11-01 | Perforation Treatment Performed - Jet Perforation |
| 1994-11-03 | Well Began Production |
| 1994-11-03 | Well Fluid changed to Crude Oil |
| 1994-11-03 | Well Mode changed to Pumping |
| 1994-11-21 | Well Log Performed |
| 1995-07-11 | Perforation Treatment Performed - Jet Perforation |
| 1996-01-01 | Well Fluid changed to Crude Oil |
| 1996-01-01 | Well Mode changed to Suspended |
| 1996-10-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-10-10 | Perforation Treatment Performed - Jet Perforation |
| 1996-10-10 | Plug Back Performed |
| 1996-10-10 | Well Fluid changed to Crude Oil |
| 1996-10-10 | Well Mode changed to Abandoned Zone |
| 2002-05-08 | Perforation Treatment Performed - Jet Perforation |
| 2007-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-06-29 | Perforation Treatment Performed - Jet Perforation |
| 2010-06-30 | Perforation Treatment Performed - Cement Squeeze |
| 2010-06-30 | Perforation Treatment Performed - Jet Perforation |
| 2010-06-30 | Plug Back Performed |
| 2010-07-08 | Perforation Treatment Performed - Jet Perforation |
| 2010-07-09 | Perforation Treatment Performed - Cement Squeeze |
| 2010-07-09 | Plug Back Performed |
| 2010-07-10 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-21 | Well Fluid changed to Crude Oil |
| 2010-11-21 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1994-09-25 | 238.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1994-11-01 | Perforation | 1059.50 | 1060.20 | 13 |
| 2010-06-30 | Cement Squeeze | 877.50 | 879.50 | 0 |
| 2010-06-30 | Perforation | 881.00 | 883.00 | 17 |
| 2010-06-30 | Cement Squeeze | 881.00 | 883.00 | 0 |
| 2010-07-08 | Perforation | 1019.50 | 1020.50 | 17 |
| 2010-07-09 | Cement Squeeze | 1019.50 | 1020.50 | 0 |
| 2010-07-10 | Perforation | 1053.00 | 1060.20 | 17 |
| 1995-07-11 | Perforation | 1057.00 | 1058.50 | 13 |
| 1996-10-10 | Packing Device Capped w/Cement | 1042.00 | 1050.00 | 0 |
| 1996-10-10 | Perforation | 1019.50 | 1020.50 | 14 |
| 2002-05-08 | Perforation | 877.50 | 879.50 | 20 |
| 2002-05-08 | Perforation | 881.00 | 883.00 | 20 |
| 2007-10-17 | Packing Device Capped w/Cement | 1008.00 | 1016.00 | 0 |
| 2007-10-17 | Packing Device Capped w/Cement | 862.00 | 870.00 | 0 |
| 2010-06-29 | Perforation | 877.50 | 879.50 | 17 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1994 | 1094 | 0.0 | 0.0 | 0.0 |
| 1995 | 3683 | 0.0 | 0.0 | 0.0 |
| 2010 | 738 | 0.0 | 0.0 | 0.0 |
| 2011 | 7393 | 0.0 | 0.0 | 0.0 |
| 2012 | 7767 | 0.0 | 0.0 | 0.0 |
| 2013 | 7106 | 0.0 | 0.0 | 0.0 |
| 2014 | 7662 | 0.0 | 0.0 | 0.0 |
| 2015 | 7544 | 0.0 | 0.0 | 0.0 |
| 2016 | 8431 | 0.0 | 0.0 | 0.0 |
| 2017 | 7899 | 0.0 | 0.0 | 0.0 |
| 2018 | 8238 | 0.0 | 0.0 | 0.0 |
| 2019 | 2522 | 0.0 | 0.0 | 0.0 |
| 2020 | 2078 | 0.0 | 0.0 | 0.0 |
For data sources see[6]