X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404180211000

Well Details

Well ID: 0404180211000
Loading map...
Location: 00/11-02-040-18W4/0
Location Alias: 00/11-02-40-18 W4M
Location Alias 2: 00/11-02-040-18 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 18
Section: 02
County/Municipality: County of Stettler No. 6
Well Name: QUATTRO LEAHST 11-2-40-18
Operator Name: Quattro Exploration and Production Ltd.
License Number: 0139744
License Date: 1989-05-05
License Status: Abandoned
Spud Date: 1989-06-08
Final Drill Date: 1989-06-18
Well Total Depth: 1300.00 m
Surface Hole Latitude: 52.414008
Surface Hole Longitude: -112.490923

For data sources see[1][2]

Well History

Date Event
1989-05-05 Obtained License
1989-06-13 Surface Casing Operation Performed
1989-06-18 Finished Drilling
1989-06-18 Well Log Performed
1989-06-20 Drill Stem Test Performed
1989-06-20 Production Casing Operation Performed
1989-06-20 Rig Released
1989-06-26 Well Log Performed
1989-06-27 Perforation Treatment Performed - Jet Perforation
1989-06-27 Well Log Performed
1989-06-28 Perforation Treatment Performed - Jet Perforation
1989-06-28 Well Mode changed to Drilled and Cased
1994-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-03 Plug Back Performed
1994-11-03 Well Log Performed
1994-11-03 Well Mode changed to Abandoned Zone
1994-11-04 Well Log Performed
1994-11-05 Perforation Treatment Performed - Jet Perforation
1998-02-02 Perforation Treatment Performed - Cement Squeeze
1998-02-02 Plug Back Performed
1998-02-04 Perforation Treatment Performed - Jet Perforation
1999-11-17 Well Began Production
1999-11-17 Well Fluid changed to Gas
1999-11-17 Well Mode changed to Flowing
2000-12-19 Perforation Treatment Performed - Jet Perforation
2000-12-20 Well Fluid changed to Gas
2000-12-20 Well Mode changed to Suspended
2002-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-25 Plug Back Performed
2002-05-25 Well Fluid changed to Gas
2002-05-25 Well Mode changed to Abandoned Zone
2002-07-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-06-27 Perforation 1230.00 1231.00 13
2002-05-25 Packing Device Capped w/Cement 1037.00 1045.00 0
1989-06-28 Perforation 1230.00 1231.50 13
1994-11-03 Packing Device Capped w/Cement 1207.00 1215.00 0
1994-11-05 Perforation 1055.00 1057.00 13
1998-02-02 Cement Squeeze 1055.00 1057.00 0
1998-02-04 Perforation 1230.00 1231.00 13
1998-02-04 Perforation 1230.00 1231.50 13
2000-12-19 Perforation 1055.00 1057.00 13
2002-05-25 Packing Device Capped w/Cement 1217.00 1225.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1256 0.0 0.0 0.0
2000 7504 0.0 0.0 0.0

For data sources see[5]

References