X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404233110022

Well Details

Well ID: 0404233110022
Loading map...
Location: 02/10-31-040-23W4/2
Location Alias: 02/10-31-40-23 W4M
Location Alias 2: 02/10-31-040-23 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 23
Section: 31
County/Municipality: Lacombe County
Well Name: Vantage BASHAW 10-31-40-23
Operator Name: Vantage Point Resources Inc.
License Number: 0200197
License Date: 1997-04-10
License Status: Amended
Spud Date: 1997-04-23
Final Drill Date: 1997-04-27
Well Total Depth: 699.00 m
Surface Hole Latitude: 52.485727
Surface Hole Longitude: -113.294027

For data sources see[1][2]

Well History

Date Event
1997-04-10 Obtained License
1997-04-24 Direction Drilling Operation Performed - Deviate
1997-04-27 Finished Drilling
1997-04-27 Well Log Performed
1997-04-27 Well Mode changed to Drilled and Cased
1997-04-28 Production Casing Operation Performed
1997-04-28 Rig Released
1997-05-03 Well Log Performed
1997-05-04 Perforation Treatment Performed - Jet Perforation
1997-05-04 Well Log Performed
1997-05-05 Perforation Treatment Performed - Jet Perforation
1997-05-05 Well Log Performed
1997-05-06 Perforation Treatment Performed - Jet Perforation
2004-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-12-02 Plug Back Performed
2004-12-02 Well Log Performed
2004-12-03 Perforation Treatment Performed - Jet Perforation
2004-12-03 Well Log Performed
2004-12-20 Perforation Treatment Performed - Fractured
2005-11-21 Well Began Production
2005-11-21 Well Fluid changed to Gas
2005-11-21 Well Mode changed to Flowing
2007-05-31 Well Fluid changed to Gas
2007-05-31 Well Mode changed to Suspended
2009-03-02 Well Fluid changed to Gas
2009-03-02 Well Mode changed to Flowing
2017-11-01 Well Fluid changed to Gas
2017-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-04-24 82.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-05-04 Perforation 647.00 649.00 20
2004-12-03 Perforation 391.00 394.00 7
2004-12-03 Perforation 404.00 406.00 7
2004-12-03 Perforation 420.00 424.00 7
2004-12-03 Perforation 436.00 437.00 7
2004-12-03 Perforation 452.00 453.00 7
2004-12-03 Perforation 471.00 472.50 7
2004-12-20 Fracture 264.00 472.50 0
1997-05-05 Perforation 631.00 634.00 20
1997-05-06 Perforation 530.00 536.00 20
2004-12-02 Packing Device Capped w/Cement 524.80 525.10 0
2004-12-03 Perforation 264.00 266.00 7
2004-12-03 Perforation 322.00 323.50 7
2004-12-03 Perforation 334.00 335.00 7
2004-12-03 Perforation 344.00 345.00 7
2004-12-03 Perforation 366.00 368.00 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 784 0.0 0.0 0.0
2006 1994 0.0 0.0 0.0
2011 8594 0.0 0.0 0.0
2012 8010 0.0 0.0 0.0
2013 8660 0.0 0.0 0.0
2014 8757 0.0 0.0 0.0
2015 8003 0.0 0.0 0.0

For data sources see[6]

References