X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404233115000

Well Details

Well ID: 0404233115000
Loading map...
Location: 00/15-31-040-23W4/0
Location Alias: 00/15-31-40-23 W4M
Location Alias 2: 00/15-31-040-23 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 23
Section: 31
County/Municipality: Lacombe County
Well Name: Vantage BASHAW 15-31-40-23
Operator Name: Vantage Point Resources Inc.
License Number: 0205821
License Date: 1997-09-08
License Status: Issued
Spud Date: 1997-09-10
Final Drill Date: 1997-09-23
Well Total Depth: 1736.00 m
Surface Hole Latitude: 52.491033
Surface Hole Longitude: -113.295359

For data sources see[1][2]

Well History

Date Event
1997-09-08 Obtained License
1997-09-11 Surface Casing Operation Performed
1997-09-15 Well Log Performed
1997-09-16 Direction Drilling Operation Performed - Deviate
1997-09-23 Finished Drilling
1997-09-23 Well Mode changed to Drilled and Cased
1997-09-27 Well Log Performed
1997-09-30 Production Casing Operation Performed
1997-10-01 Rig Released
1997-10-04 Well Log Performed
1997-10-05 Perforation Treatment Performed - Jet Perforation
1997-10-07 Perforation Treatment Performed - Jet Perforation
1997-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-10 Plug Back Performed
1997-10-10 Well Log Performed
1997-10-14 Perforation Treatment Performed - Jet Perforation
1997-10-14 Well Log Performed
1997-10-16 Perforation Treatment Performed - Jet Perforation
1997-10-17 Perforation Treatment Performed - Jet Perforation
1997-10-17 Well Log Performed
1998-09-07 Well Began Production
1998-09-07 Well Fluid changed to Gas
1998-09-07 Well Mode changed to Flowing
2009-03-02 Well Fluid changed to Gas
2009-03-02 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-09-16 1046.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-10-05 Perforation 1565.60 1569.00 20
1997-10-07 Perforation 1569.00 1572.50 20
1997-10-10 Packing Device Capped w/Cement 1555.00 1563.00 0
1997-10-14 Perforation 740.30 742.00 18
1997-10-16 Perforation 747.50 748.50 18
1997-10-16 Perforation 755.50 757.00 18
1997-10-17 Perforation 529.50 529.60 2
1997-10-17 Perforation 529.00 532.80 18

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2413 0.0 0.0 0.0
1999 8533 0.0 0.0 0.0
2000 8634 0.0 0.0 0.0
2001 8556 0.0 0.0 0.0
2002 8714 0.0 0.0 0.0
2003 8660 0.0 0.0 0.0
2004 8759 0.0 0.0 0.0
2005 8271 0.0 0.0 0.0
2006 8635 0.0 0.0 0.0
2007 7812 0.0 0.0 0.0
2008 353 0.0 0.0 0.0

For data sources see[6]

References