If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404240208000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.410605,"lon":-113.342428,"icon":""}]} |
Location: 00/08-02-040-24W4/0 | |
Location Alias: 00/08-02-40-24 W4M | |
Location Alias 2: 00/08-02-040-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 24 | |
Section: 02 | |
County/Municipality: Lacombe County | |
Well Name: ENHANCEENERGY CLIVE 8-2-40-24 | |
Operator Name: Enhance Energy Inc. | |
License Number: 0107840 | |
License Date: 1984-06-22 | |
License Status: Issued | |
Spud Date: 1984-08-03 | |
Final Drill Date: 1984-08-14 | |
Well Total Depth: 1965.00 m | |
Surface Hole Latitude: 52.410605 | |
Surface Hole Longitude: -113.342428 |
Date | Event |
---|---|
1984-06-22 | Obtained License |
1984-08-03 | Surface Casing Operation Performed |
1984-08-14 | Finished Drilling |
1984-08-14 | Well Mode changed to Drilled and Cased |
1984-08-15 | Lost Circulation Occurred |
1984-08-15 | Well Log Performed |
1984-08-16 | Production Casing Operation Performed |
1984-08-16 | Rig Released |
1984-10-17 | Well Log Performed |
1984-10-18 | Perforation Treatment Performed - Jet Perforation |
1984-10-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-10-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-10-24 | Perforation Treatment Performed - Jet Perforation |
1984-12-11 | Well Began Production |
1984-12-11 | Well Fluid changed to Crude Oil |
1984-12-11 | Well Mode changed to Pumping |
1988-07-19 | Well Log Performed |
1988-07-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-07-21 | Perforation Treatment Performed - Jet Perforation |
1993-03-10 | Perforation Treatment Performed - Cement Squeeze |
1993-03-11 | Perforation Treatment Performed - Cement Squeeze |
1993-03-16 | Perforation Treatment Performed - Jet Perforation |
1993-03-18 | Perforation Treatment Performed - Jet Perforation |
1993-03-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-03-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-11-18 | Well Log Performed |
1994-11-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-11-25 | Perforation Treatment Performed - Cement Squeeze |
1994-11-29 | Well Log Performed |
1994-11-30 | Perforation Treatment Performed - Jet Perforation |
1994-12-02 | Well Log Performed |
1994-12-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-12-03 | Perforation Treatment Performed - Jet Perforation |
1994-12-03 | Plug Back Performed |
1994-12-03 | Well Fluid changed to Crude Oil |
1994-12-03 | Well Mode changed to Abandoned Zone |
1994-12-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-12-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-12-13 | Well Log Performed |
1998-10-14 | Perforation Treatment Performed - Jet Perforation |
1998-10-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-10-18 | Perforation | 1925.00 | 1928.00 | 13 |
1993-03-16 | Perforation | 1920.50 | 1921.50 | 17 |
1993-03-18 | Perforation | 1875.50 | 1877.00 | 17 |
1993-03-19 | Acid Treatment | 1875.50 | 1877.00 | 0 |
1993-03-20 | Acid Treatment | 1875.50 | 1877.00 | 0 |
1994-11-22 | Acid Treatment | 1920.50 | 1921.50 | 0 |
1994-11-25 | Cement Squeeze | 1920.50 | 1921.50 | 0 |
1994-11-25 | Cement Squeeze | 1875.50 | 1877.00 | 0 |
1994-11-30 | Perforation | 1914.00 | 1919.00 | 13 |
1994-12-03 | Packing Device Capped w/Cement | 1902.00 | 1910.00 | 0 |
1994-12-03 | Perforation | 1868.50 | 1874.50 | 13 |
1984-10-23 | Acid Treatment | 1925.00 | 1928.00 | 0 |
1994-12-09 | Acid Treatment | 1868.50 | 1874.50 | 0 |
1994-12-12 | Packing Device Capped w/Cement | 1857.00 | 1865.00 | 0 |
1998-10-14 | Perforation | 1868.50 | 1874.50 | 13 |
1998-10-16 | Acid Treatment | 1868.50 | 1874.50 | 0 |
1984-10-24 | Perforation | 1887.00 | 1889.00 | 13 |
1984-10-24 | Acid Treatment | 1887.00 | 1889.00 | 0 |
1988-07-20 | Acid Treatment | 1887.00 | 1887.50 | 0 |
1988-07-21 | Perforation | 1887.00 | 1887.50 | 14 |
1988-07-21 | Acid Treatment | 1887.00 | 1887.50 | 0 |
1993-03-10 | Cement Squeeze | 1925.00 | 1928.00 | 0 |
1993-03-11 | Cement Squeeze | 1887.00 | 1889.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 525 | 0.0 | 0.0 | 0.0 |
1985 | 8370 | 0.0 | 0.0 | 0.0 |
1986 | 8072 | 0.0 | 0.0 | 0.0 |
1987 | 8428 | 0.0 | 0.0 | 0.0 |
1988 | 8399 | 0.0 | 0.0 | 0.0 |
1989 | 8330 | 0.0 | 0.0 | 0.0 |
1990 | 8503 | 0.0 | 0.0 | 0.0 |
1991 | 8177 | 0.0 | 0.0 | 0.0 |
1992 | 8482 | 0.0 | 0.0 | 0.0 |
1993 | 6959 | 0.0 | 0.0 | 0.0 |
1994 | 7472 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1984-08-15 | Lost Circulation | 1965.00 | 1965.00 |
For data sources see[6]