X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404240208000

Well Details

Well ID: 0404240208000
Loading map...
Location: 00/08-02-040-24W4/0
Location Alias: 00/08-02-40-24 W4M
Location Alias 2: 00/08-02-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 02
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY CLIVE 8-2-40-24
Operator Name: Enhance Energy Inc.
License Number: 0107840
License Date: 1984-06-22
License Status: Issued
Spud Date: 1984-08-03
Final Drill Date: 1984-08-14
Well Total Depth: 1965.00 m
Surface Hole Latitude: 52.410605
Surface Hole Longitude: -113.342428

For data sources see[1][2]

Well History

Date Event
1984-06-22 Obtained License
1984-08-03 Surface Casing Operation Performed
1984-08-14 Finished Drilling
1984-08-14 Well Mode changed to Drilled and Cased
1984-08-15 Lost Circulation Occurred
1984-08-15 Well Log Performed
1984-08-16 Production Casing Operation Performed
1984-08-16 Rig Released
1984-10-17 Well Log Performed
1984-10-18 Perforation Treatment Performed - Jet Perforation
1984-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-24 Perforation Treatment Performed - Jet Perforation
1984-12-11 Well Began Production
1984-12-11 Well Fluid changed to Crude Oil
1984-12-11 Well Mode changed to Pumping
1988-07-19 Well Log Performed
1988-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-21 Perforation Treatment Performed - Jet Perforation
1993-03-10 Perforation Treatment Performed - Cement Squeeze
1993-03-11 Perforation Treatment Performed - Cement Squeeze
1993-03-16 Perforation Treatment Performed - Jet Perforation
1993-03-18 Perforation Treatment Performed - Jet Perforation
1993-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-18 Well Log Performed
1994-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-25 Perforation Treatment Performed - Cement Squeeze
1994-11-29 Well Log Performed
1994-11-30 Perforation Treatment Performed - Jet Perforation
1994-12-02 Well Log Performed
1994-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-12-03 Perforation Treatment Performed - Jet Perforation
1994-12-03 Plug Back Performed
1994-12-03 Well Fluid changed to Crude Oil
1994-12-03 Well Mode changed to Abandoned Zone
1994-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-12-13 Well Log Performed
1998-10-14 Perforation Treatment Performed - Jet Perforation
1998-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-10-18 Perforation 1925.00 1928.00 13
1993-03-16 Perforation 1920.50 1921.50 17
1993-03-18 Perforation 1875.50 1877.00 17
1993-03-19 Acid Treatment 1875.50 1877.00 0
1993-03-20 Acid Treatment 1875.50 1877.00 0
1994-11-22 Acid Treatment 1920.50 1921.50 0
1994-11-25 Cement Squeeze 1920.50 1921.50 0
1994-11-25 Cement Squeeze 1875.50 1877.00 0
1994-11-30 Perforation 1914.00 1919.00 13
1994-12-03 Packing Device Capped w/Cement 1902.00 1910.00 0
1994-12-03 Perforation 1868.50 1874.50 13
1984-10-23 Acid Treatment 1925.00 1928.00 0
1994-12-09 Acid Treatment 1868.50 1874.50 0
1994-12-12 Packing Device Capped w/Cement 1857.00 1865.00 0
1998-10-14 Perforation 1868.50 1874.50 13
1998-10-16 Acid Treatment 1868.50 1874.50 0
1984-10-24 Perforation 1887.00 1889.00 13
1984-10-24 Acid Treatment 1887.00 1889.00 0
1988-07-20 Acid Treatment 1887.00 1887.50 0
1988-07-21 Perforation 1887.00 1887.50 14
1988-07-21 Acid Treatment 1887.00 1887.50 0
1993-03-10 Cement Squeeze 1925.00 1928.00 0
1993-03-11 Cement Squeeze 1887.00 1889.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 525 0.0 0.0 0.0
1985 8370 0.0 0.0 0.0
1986 8072 0.0 0.0 0.0
1987 8428 0.0 0.0 0.0
1988 8399 0.0 0.0 0.0
1989 8330 0.0 0.0 0.0
1990 8503 0.0 0.0 0.0
1991 8177 0.0 0.0 0.0
1992 8482 0.0 0.0 0.0
1993 6959 0.0 0.0 0.0
1994 7472 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-08-15 Lost Circulation 1965.00 1965.00

For data sources see[6]

References