X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404240212000

Well Details

Well ID: 0404240212000
Loading map...
Location: 00/12-02-040-24W4/0
Location Alias: 00/12-02-40-24 W4M
Location Alias 2: 00/12-02-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 02
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 12-2-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0029027
License Date: 1965-09-23
License Status: Suspension
Spud Date: 1965-10-02
Final Drill Date: 1965-10-14
Well Total Depth: 1889.50 m
Surface Hole Latitude: 52.414189
Surface Hole Longitude: -113.360279

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-09-23 Obtained License
1965-10-14 Finished Drilling
1965-10-14 Well Mode changed to Drilled and Cased
1965-10-16 Production Casing Operation Performed
1965-10-24 Perforation Treatment Performed - Jet Perforation
1965-10-25 Perforation Treatment Performed - Acid Wash - No Pressure
1965-10-27 Well Began Production
1965-10-27 Well Fluid changed to Crude Oil
1965-10-27 Well Mode changed to Flowing
1965-10-28 Perforation Treatment Performed - Jet Perforation
1979-05-31 Well Fluid changed to Crude Oil
1979-05-31 Well Mode changed to Pumping
1986-03-28 Perforation Treatment Performed - Cement Squeeze
1986-04-02 Perforation Treatment Performed - Jet Perforation
1986-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-08 Perforation Treatment Performed - Jet Perforation
1986-04-09 Perforation Treatment Performed - Acid Wash - No Pressure
1988-08-20 Perforation Treatment Performed - Cement Squeeze
1988-08-23 Perforation Treatment Performed - Cement Squeeze
1988-08-25 Perforation Treatment Performed - Jet Perforation
1988-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-08 Perforation Treatment Performed - Cement Squeeze
1988-09-08 Plug Back Performed
1988-09-08 Well Fluid changed to Crude Oil
1988-09-08 Well Mode changed to Abandoned Zone
1988-09-10 Perforation Treatment Performed - Jet Perforation
1988-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-23 Well Log Performed
1999-06-25 Well Log Performed
1999-06-27 Perforation Treatment Performed - Cement Squeeze
1999-06-27 Perforation Treatment Performed - Chemical Squeeze
1999-06-28 Perforation Treatment Performed - Jet Perforation
1999-06-28 Well Log Performed
1999-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-21 Perforation Treatment Performed - Cement Squeeze
2002-12-03 Perforation Treatment Performed - Jet Perforation
2002-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-08 Well Fluid changed to Crude Oil
2002-12-08 Well Mode changed to Pumping
2011-11-30 Well Fluid changed to Crude Oil
2011-11-30 Well Mode changed to Suspended
2015-08-06 Perforation Treatment Performed - Cement Plug
2015-08-06 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-10-24 Perforation 1885.50 1886.10 7
1988-08-20 Cement Squeeze 1882.80 1886.10 0
1988-08-23 Cement Squeeze 1844.30 1844.80 0
1988-08-25 Perforation 1877.50 1878.50 13
1988-08-26 Acid Treatment 1877.50 1878.50 0
1988-09-08 Cement Squeeze 1877.50 1878.50 0
1988-09-10 Perforation 1841.30 1842.30 13
1988-09-13 Acid Treatment 1841.30 1842.30 0
1999-06-27 Chemical Squeeze 1841.30 1842.30 0
1999-06-27 Cement Squeeze 1841.30 1842.30 0
1999-06-28 Perforation 1836.50 1839.00 13
1965-10-25 Acid Wash 1885.50 1886.10 0
1999-06-29 Acid Treatment 1836.50 1839.00 0
2002-11-21 Cement Squeeze 1836.50 1839.00 0
2002-12-03 Perforation 1876.60 1879.60 17
2002-12-04 Acid Treatment 1876.60 1879.60 0
2015-08-06 Cement Plug 1704.70 1880.00 0
1965-10-28 Perforation 1845.60 1847.10 7
1986-03-28 Cement Squeeze 1845.60 1847.10 0
1986-04-02 Perforation 1882.80 1883.40 8
1986-04-03 Acid Treatment 1882.80 1883.40 0
1986-04-05 Acid Treatment 1882.80 1883.40 0
1986-04-08 Perforation 1844.30 1844.80 7
1986-04-09 Acid Wash 1844.30 1844.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6596 0.0 0.0 0.0
1968 4323 0.0 0.0 0.0
1969 2558 0.0 0.0 0.0
1970 3838 0.0 0.0 0.0
1971 6856 0.0 0.0 0.0
1972 8005 0.0 0.0 0.0
1973 8076 0.0 0.0 0.0
1974 4804 0.0 0.0 0.0
1975 7892 0.0 0.0 0.0
1976 8369 0.0 0.0 0.0
1977 8417 0.0 0.0 0.0
1978 7873 0.0 0.0 0.0
1979 7028 0.0 0.0 0.0
1980 8111 0.0 0.0 0.0
1981 8699 0.0 0.0 0.0
1982 8342 0.0 0.0 0.0
1983 8599 0.0 0.0 0.0
1984 8303 0.0 0.0 0.0
1985 5519 0.0 0.0 0.0
1986 5958 0.0 0.0 0.0
1987 8227 0.0 0.0 0.0
1988 5289 0.0 0.0 0.0
2002 575 0.0 0.0 0.0
2003 8687 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8471 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 2783 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References