X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404240212002

Well Details

Well ID: 0404240212002
Loading map...
Location: 00/12-02-040-24W4/2
Location Alias: 00/12-02-40-24 W4M
Location Alias 2: 00/12-02-040-24 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 02
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 12-2-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0029027
License Date: 1965-09-23
License Status: Suspension
Spud Date: 1965-10-02
Final Drill Date: 1965-10-14
Well Total Depth: 1889.50 m
Surface Hole Latitude: 52.414189
Surface Hole Longitude: -113.360279

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-09-23 Obtained License
1965-10-14 Finished Drilling
1965-10-14 Well Mode changed to Drilled and Cased
1965-10-16 Production Casing Operation Performed
1965-10-24 Perforation Treatment Performed - Jet Perforation
1965-10-25 Perforation Treatment Performed - Acid Wash - No Pressure
1965-10-28 Perforation Treatment Performed - Jet Perforation
1965-10-29 Well Began Production
1965-10-29 Well Fluid changed to Crude Oil
1965-10-29 Well Mode changed to Flowing
1983-12-22 Well Fluid changed to Crude Oil
1983-12-22 Well Mode changed to Pumping
1986-03-28 Perforation Treatment Performed - Cement Squeeze
1986-04-02 Perforation Treatment Performed - Jet Perforation
1986-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-08 Perforation Treatment Performed - Jet Perforation
1986-04-09 Perforation Treatment Performed - Acid Wash - No Pressure
1988-08-20 Perforation Treatment Performed - Cement Squeeze
1988-08-23 Perforation Treatment Performed - Cement Squeeze
1988-08-25 Perforation Treatment Performed - Jet Perforation
1988-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-08 Perforation Treatment Performed - Cement Squeeze
1988-09-08 Plug Back Performed
1988-09-08 Well Fluid changed to Crude Oil
1988-09-08 Well Mode changed to Pumping
1988-09-10 Perforation Treatment Performed - Jet Perforation
1988-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-23 Well Log Performed
1999-06-25 Well Log Performed
1999-06-27 Perforation Treatment Performed - Cement Squeeze
1999-06-27 Perforation Treatment Performed - Chemical Squeeze
1999-06-28 Perforation Treatment Performed - Jet Perforation
1999-06-28 Well Log Performed
1999-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-21 Perforation Treatment Performed - Cement Squeeze
2002-12-03 Perforation Treatment Performed - Jet Perforation
2002-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-30 Well Fluid changed to Crude Oil
2011-11-30 Well Mode changed to Suspended
2015-08-06 Perforation Treatment Performed - Cement Plug
2015-08-06 Plug Back Performed
2015-08-06 Well Fluid changed to Crude Oil
2015-08-06 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-10-24 Perforation 1885.50 1886.10 7
1988-08-20 Cement Squeeze 1882.80 1886.10 0
1988-08-23 Cement Squeeze 1844.30 1844.80 0
1988-08-25 Perforation 1877.50 1878.50 13
1988-08-26 Acid Treatment 1877.50 1878.50 0
1988-09-08 Cement Squeeze 1877.50 1878.50 0
1988-09-10 Perforation 1841.30 1842.30 13
1988-09-13 Acid Treatment 1841.30 1842.30 0
1999-06-27 Chemical Squeeze 1841.30 1842.30 0
1999-06-27 Cement Squeeze 1841.30 1842.30 0
1999-06-28 Perforation 1836.50 1839.00 13
1965-10-25 Acid Wash 1885.50 1886.10 0
1999-06-29 Acid Treatment 1836.50 1839.00 0
2002-11-21 Cement Squeeze 1836.50 1839.00 0
2002-12-03 Perforation 1876.60 1879.60 17
2002-12-04 Acid Treatment 1876.60 1879.60 0
2015-08-06 Cement Plug 1704.70 1880.00 0
1965-10-28 Perforation 1845.60 1847.10 7
1986-03-28 Cement Squeeze 1845.60 1847.10 0
1986-04-02 Perforation 1882.80 1883.40 8
1986-04-03 Acid Treatment 1882.80 1883.40 0
1986-04-05 Acid Treatment 1882.80 1883.40 0
1986-04-08 Perforation 1844.30 1844.80 7
1986-04-09 Acid Wash 1844.30 1844.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5403 0.0 0.0 0.0
1968 4515 0.0 0.0 0.0
1969 4588 0.0 0.0 0.0
1970 3888 0.0 0.0 0.0
1971 6562 0.0 0.0 0.0
1972 8161 0.0 0.0 0.0
1973 8268 0.0 0.0 0.0
1974 6517 0.0 0.0 0.0
1975 8280 0.0 0.0 0.0
1976 8488 0.0 0.0 0.0
1977 8398 0.0 0.0 0.0
1978 8425 0.0 0.0 0.0
1979 8383 0.0 0.0 0.0
1980 8111 0.0 0.0 0.0
1981 8591 0.0 0.0 0.0
1982 7437 0.0 0.0 0.0
1983 7479 0.0 0.0 0.0
1984 7447 0.0 0.0 0.0
1985 7654 0.0 0.0 0.0
1986 7700 0.0 0.0 0.0
1987 7976 0.0 0.0 0.0
1988 7007 0.0 0.0 0.0
1989 7889 0.0 0.0 0.0
1990 8404 0.0 0.0 0.0
1991 7718 0.0 0.0 0.0
1992 8491 0.0 0.0 0.0
1993 8337 0.0 0.0 0.0
1994 8421 0.0 0.0 0.0
1995 8132 0.0 0.0 0.0
1996 7755 0.0 0.0 0.0
1997 8048 0.0 0.0 0.0
1998 8758 0.0 0.0 0.0
1999 7870 0.0 0.0 0.0
2000 8428 0.0 0.0 0.0
2001 1500 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References