X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241011000

Well Details

Well ID: 0404241011000
Loading map...
Location: 00/11-10-040-24W4/0
Location Alias: 00/11-10-40-24 W4M
Location Alias 2: 00/11-10-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 10
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 11-10-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0141705
License Date: 1989-11-10
License Status: Suspension
Spud Date: 1990-01-13
Final Drill Date: 1990-01-23
Well Total Depth: 1988.90 m
Surface Hole Latitude: 52.428218
Surface Hole Longitude: -113.377557

For data sources see[1][2]

Well History

Date Event
1989-11-10 Obtained License
1990-01-13 Lost Circulation Occurred
1990-01-14 Surface Casing Operation Performed
1990-01-23 Finished Drilling
1990-01-23 Well Log Performed
1990-01-23 Well Mode changed to Drilled and Cased
1990-01-24 Production Casing Operation Performed
1990-01-24 Rig Released
1990-02-08 Perforation Treatment Performed - Jet Perforation
1990-02-08 Well Log Performed
1990-02-11 Well Log Performed
1990-02-15 Perforation Treatment Performed - Jet Perforation
1990-02-15 Well Log Performed
1990-02-18 Perforation Treatment Performed - Acid Wash - No Pressure
1990-02-21 Perforation Treatment Performed - Cement Squeeze
1990-02-26 Perforation Treatment Performed - Jet Perforation
1990-02-26 Well Log Performed
1990-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-02 Perforation Treatment Performed - Jet Perforation
1990-03-02 Well Log Performed
1990-03-03 Perforation Treatment Performed - Cement Squeeze
1990-03-06 Well Log Performed
1990-03-07 Perforation Treatment Performed - Abrasa-Jet Perforation
1990-03-09 Perforation Treatment Performed - Acid Wash - No Pressure
1990-03-11 Perforation Treatment Performed - Jet Perforation
1990-03-11 Well Log Performed
1990-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-01 Well Began Production
1990-05-01 Well Fluid changed to Crude Oil
1990-05-01 Well Mode changed to Pumping
1990-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-12-11 Perforation Treatment Performed - Jet Perforation
1990-12-11 Well Log Performed
1992-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-20 Perforation Treatment Performed - Cement Squeeze
1994-07-25 Perforation Treatment Performed - Open-Hole Completion
1994-07-28 Perforation Treatment Performed - Jet Perforation
1994-07-28 Well Log Performed
1995-06-20 Well Fluid changed to Crude Oil
1995-06-20 Well Mode changed to Suspended
2001-07-23 Well Log Performed
2001-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-24 Plug Back Performed
2001-07-24 Well Fluid changed to Crude Oil
2001-07-24 Well Mode changed to Abandoned Zone
2001-07-27 Well Log Performed
2001-07-28 Perforation Treatment Performed - Jet Perforation
2005-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-09 Plug Back Performed
2019-11-04 Perforation Treatment Performed - Cement Plug
2019-11-04 Plug Back Performed
2019-11-06 Well Log Performed
2019-11-08 Perforation Treatment Performed - Cement Plug
2019-11-08 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-02-08 Perforation 1925.00 1926.00 13
1990-03-07 Hydra Jet Perforation 1925.50 1925.50 0
1990-03-09 Acid Wash 1925.50 1925.50 0
1990-03-11 Perforation 1923.30 1924.30 13
1990-03-11 Perforation 1924.50 1925.50 13
1990-03-13 Acid Treatment 1923.30 1925.50 0
1990-12-07 Acid Treatment 1923.30 1925.50 0
1990-12-11 Perforation 1922.50 1923.80 13
1992-01-15 Acid Treatment 1922.50 1925.50 0
1994-07-20 Cement Squeeze 1922.50 1925.50 0
1994-07-25 Open Hole/Barefoot Completion 1937.00 1988.90 0
1990-02-15 Perforation 1888.30 1889.00 13
1994-07-28 Perforation 1916.00 1918.50 17
2001-07-24 Packing Device Capped w/Cement 1904.00 1912.00 0
2001-07-28 Perforation 1619.00 1620.50 17
2001-07-28 Perforation 1634.50 1636.00 17
2005-11-09 Packing Device Capped w/Cement 1872.00 1880.00 0
2019-11-04 Cement Plug 1822.00 1872.00 0
2019-11-08 Cement Plug 1237.00 1627.00 0
2019-11-08 Cement Plug 843.00 1237.00 0
1990-02-18 Acid Wash 1888.30 1889.00 0
1990-02-21 Cement Squeeze 1925.00 1926.00 0
1990-02-21 Cement Squeeze 1888.30 1889.00 0
1990-02-26 Perforation 1925.00 1926.00 13
1990-02-28 Acid Treatment 1925.00 1926.00 0
1990-03-02 Perforation 1927.50 1928.50 13
1990-03-03 Cement Squeeze 1925.00 1928.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3558 0.0 0.0 0.0
1991 8100 0.0 0.0 0.0
1992 8172 0.0 0.0 0.0
1993 2339 0.0 0.0 0.0
1994 2554 0.0 0.0 0.0
1995 2570 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-01-13 Lost Circulation 18.00 208.00
2019-11-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References