X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404241609000

Well Details

Well ID: 0404241609000
Loading map...
Location: 00/09-16-040-24W4/0
Location Alias: 00/09-16-40-24 W4M
Location Alias 2: 00/09-16-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 16
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 9-16-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0006337
License Date: 1953-04-22
License Status: Suspension
Spud Date: 1953-04-24
Final Drill Date: 1953-05-24
Well Total Depth: 1949.20 m
Surface Hole Latitude: 52.443285
Surface Hole Longitude: -113.390449

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-04-22 Obtained License
1953-05-19 Drill Stem Test Performed
1953-05-22 Drill Stem Test Performed
1953-05-23 Drill Stem Test Performed
1953-05-24 Finished Drilling
1953-05-24 Well Mode changed to Drilled and Cased
1953-05-26 Production Casing Operation Performed
1953-05-28 Perforation Treatment Performed - Jet Perforation
1953-05-29 Drill Stem Test Performed
1953-05-31 Well Began Production
1953-05-31 Well Fluid changed to Crude Oil
1953-05-31 Well Mode changed to Flowing
1956-05-05 Perforation Treatment Performed - Cement Squeeze
1956-05-09 Perforation Treatment Performed - Jet Perforation
1956-05-12 Perforation Treatment Performed - Bullet Perforation
1960-11-03 Perforation Treatment Performed - Acid Wash - No Pressure
1976-10-24 Well Log Performed
1979-11-19 Well Log Performed
1981-04-09 Well Fluid changed to Crude Oil
1981-04-09 Well Mode changed to Pumping
1989-06-09 Well Log Performed
1989-06-14 Perforation Treatment Performed - Cement Squeeze
1989-06-16 Perforation Treatment Performed - Jet Perforation
1989-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-01 Perforation Treatment Performed - Cement Squeeze
1991-10-01 Plug Back Performed
1991-10-01 Well Fluid changed to Crude Oil
1991-10-01 Well Mode changed to Abandoned Zone
1991-10-02 Perforation Treatment Performed - Jet Perforation
1991-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-08 Perforation Treatment Performed - Jet Perforation
1991-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-04 Perforation Treatment Performed - Acid Wash - No Pressure
1994-08-05 Perforation Treatment Performed - Cement Squeeze
1994-08-07 Well Log Performed
1994-08-08 Perforation Treatment Performed - Jet Perforation
1994-08-08 Well Log Performed
1994-08-09 Perforation Treatment Performed - Jet Perforation
1994-08-11 Perforation Treatment Performed - Acid Wash - No Pressure
1994-08-12 Perforation Treatment Performed - Cement Squeeze
1994-08-18 Well Fluid changed to Crude Oil
1994-08-18 Well Mode changed to Pumping
2003-11-08 Perforation Treatment Performed - Jet Perforation
2003-11-08 Well Log Performed
2003-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-09-07 Well Log Performed
2011-11-30 Well Fluid changed to Crude Oil
2011-11-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-05-28 Perforation 1927.90 1928.50 13
1991-10-02 Perforation 1887.50 1889.50 16
1991-10-04 Acid Treatment 1887.50 1889.50 0
1991-10-08 Perforation 1889.50 1891.50 16
1991-10-10 Acid Treatment 1887.50 1891.50 0
1991-10-15 Acid Treatment 1887.50 1891.50 0
1994-08-04 Acid Wash 1887.50 1891.50 0
1994-08-05 Cement Squeeze 1887.50 1891.50 0
1994-08-08 Perforation 1915.50 1917.00 18
1994-08-09 Perforation 1879.00 1883.50 18
1994-08-11 Acid Wash 1879.00 1883.50 0
1956-05-05 Cement Squeeze 1927.90 1928.50 0
1994-08-12 Cement Squeeze 1879.00 1883.50 0
2003-11-08 Perforation 1908.00 1910.00 17
2003-11-12 Acid Treatment 1908.00 1910.00 0
1956-05-09 Perforation 1926.00 1926.60 20
1956-05-12 Bullet Perforation 1926.00 1926.60 20
1960-11-03 Acid Wash 1926.00 1926.60 0
1989-06-14 Cement Squeeze 1926.00 1928.50 0
1989-06-16 Perforation 1920.00 1921.00 13
1989-06-17 Acid Treatment 1920.00 1921.00 0
1991-10-01 Cement Squeeze 1920.00 1921.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 766 0.0 0.0 0.0
1968 590 0.0 0.0 0.0
1969 620 0.0 0.0 0.0
1970 839 0.0 0.0 0.0
1980 774 0.0 0.0 0.0
1981 6292 0.0 0.0 0.0
1982 7074 0.0 0.0 0.0
1983 8663 0.0 0.0 0.0
1984 6831 0.0 0.0 0.0
1985 7932 0.0 0.0 0.0
1986 1896 0.0 0.0 0.0
1987 120 0.0 0.0 0.0
1989 4322 0.0 0.0 0.0
1990 3620 0.0 0.0 0.0
1994 3221 0.0 0.0 0.0
1995 8079 0.0 0.0 0.0
1996 8413 0.0 0.0 0.0
1997 8005 0.0 0.0 0.0
1998 4703 0.0 0.0 0.0
2003 1026 0.0 0.0 0.0
2004 5207 0.0 0.0 0.0

For data sources see[5]

References