If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404242113002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.461494,"lon":-113.408228,"icon":""}]} |
Location: 00/13-21-040-24W4/2 | |
Location Alias: 00/13-21-40-24 W4M | |
Location Alias 2: 00/13-21-040-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 24 | |
Section: 21 | |
County/Municipality: Lacombe County | |
Well Name: ENHANCEENERGY CLIVE 13-21-40-24 | |
Operator Name: Enhance Energy Inc. | |
License Number: 0024228 | |
License Date: 1963-05-31 | |
License Status: Suspension | |
Spud Date: 1963-06-05 | |
Final Drill Date: 1963-06-23 | |
Well Total Depth: 1932.40 m | |
Surface Hole Latitude: 52.461494 | |
Surface Hole Longitude: -113.408228 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-05-31 | Obtained License |
1963-06-14 | Drill Stem Test Performed |
1963-06-21 | Lost Circulation Occurred |
1963-06-23 | Finished Drilling |
1963-06-23 | Well Mode changed to Drilled and Cased |
1963-06-24 | Drill Stem Test Performed |
1963-06-26 | Production Casing Operation Performed |
1963-06-28 | Perforation Treatment Performed - Jet Perforation |
1963-06-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-07-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-07-15 | Well Began Production |
1963-07-15 | Well Fluid changed to Crude Oil |
1963-07-15 | Well Mode changed to Flowing |
1963-10-08 | Well Fluid changed to Crude Oil |
1963-10-08 | Well Mode changed to Pumping |
1964-11-20 | Well Fluid changed to Crude Oil |
1964-11-20 | Well Mode changed to Suspended |
1977-05-06 | Well Log Performed |
1977-05-10 | Perforation Treatment Performed - Jet Perforation |
1977-05-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-05-11 | Well Fluid changed to Crude Oil |
1977-05-11 | Well Mode changed to Pumping |
1978-03-09 | Perforation Treatment Performed - Cement Squeeze |
1978-03-09 | Well Fluid changed to Crude Oil |
1978-03-09 | Well Mode changed to Abandoned Zone |
1984-11-29 | Perforation Treatment Performed - Cement Squeeze |
1984-11-30 | Perforation Treatment Performed - Jet Perforation |
1984-12-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-11-14 | Perforation Treatment Performed - Cement Squeeze |
1990-11-16 | Perforation Treatment Performed - Jet Perforation |
1990-11-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-11-20 | Well Log Performed |
1990-11-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-11-21 | Plug Back Performed |
1990-11-23 | Perforation Treatment Performed - Jet Perforation |
1990-11-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-11-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-12-01 | Well Fluid changed to Crude Oil |
1990-12-01 | Well Mode changed to Pumping |
1996-04-30 | Well Fluid changed to Crude Oil |
1996-04-30 | Well Mode changed to Suspended |
2000-12-20 | Well Type changed to Observation |
2005-08-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-08-08 | Plug Back Performed |
2005-08-08 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-06-28 | Perforation | 1877.30 | 1877.90 | 20 |
1984-11-30 | Perforation | 1911.10 | 1911.40 | 7 |
1984-12-01 | Acid Treatment | 1911.10 | 1911.40 | 0 |
1990-11-14 | Cement Squeeze | 1911.10 | 1911.40 | 0 |
1990-11-16 | Perforation | 1908.00 | 1909.00 | 7 |
1990-11-20 | Acid Treatment | 1908.00 | 1909.00 | 0 |
1990-11-21 | Packing Device Capped w/Cement | 1896.30 | 1905.00 | 0 |
1990-11-23 | Perforation | 1877.30 | 1879.10 | 18 |
1990-11-24 | Acid Treatment | 1877.30 | 1879.10 | 0 |
1990-11-28 | Acid Treatment | 1877.30 | 1879.10 | 0 |
2005-08-08 | Packing Device Capped w/Cement | 1897.00 | 1905.00 | 0 |
1963-06-28 | Perforation | 1913.50 | 1914.40 | 20 |
1963-06-29 | Acid Treatment | 1877.30 | 1877.90 | 0 |
1963-06-29 | Acid Treatment | 1913.50 | 1914.40 | 0 |
1963-07-13 | Acid Treatment | 1877.30 | 1877.90 | 0 |
1977-05-10 | Perforation | 1877.60 | 1878.80 | 13 |
1977-05-11 | Acid Treatment | 1877.60 | 1878.80 | 0 |
1978-03-09 | Cement Squeeze | 1877.30 | 1878.80 | 0 |
1984-11-29 | Cement Squeeze | 1913.50 | 1914.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 3708 | 0.0 | 0.0 | 0.0 |
1990 | 116 | 0.0 | 0.0 | 0.0 |
1991 | 55 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1963-06-21 | Lost Circulation | 1892.80 | 1892.80 |
For data sources see[6]