X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404242814000

Well Details

Well ID: 0404242814000
Loading map...
Location: 00/14-28-040-24W4/0
Location Alias: 00/14-28-40-24 W4M
Location Alias 2: 00/14-28-040-24 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 24
Section: 28
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 14-28-40-24
Operator Name: Tourmaline Oil Corp.
License Number: 0112689
License Date: 1985-01-21
License Status: Suspension
Spud Date: 1985-01-29
Final Drill Date: 1985-02-12
Well Total Depth: 1938.00 m
Surface Hole Latitude: 52.476700
Surface Hole Longitude: -113.403635

For data sources see[1][2]

Well History

Date Event
1985-01-21 Obtained License
1985-01-29 Surface Casing Operation Performed
1985-01-30 Direction Drilling Operation Performed - Deviate
1985-02-12 Finished Drilling
1985-02-12 Well Log Performed
1985-02-12 Well Mode changed to Drilled and Cased
1985-02-13 Well Log Performed
1985-02-14 Drill Stem Test Performed
1985-02-14 Well Log Performed
1985-02-15 Drill Stem Test Performed
1985-02-17 Production Casing Operation Performed
1985-02-17 Rig Released
1985-03-13 Well Log Performed
1985-03-14 Perforation Treatment Performed - Jet Perforation
1985-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-12 Well Began Production
1985-06-12 Well Fluid changed to Crude Oil
1985-06-12 Well Mode changed to Pumping
1992-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-26 Perforation Treatment Performed - Cement Squeeze
1995-07-27 Well Log Performed
1995-07-28 Well Log Performed
1995-07-29 Perforation Treatment Performed - Jet Perforation
1995-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-10 Well Began Injection
1995-08-10 Well Fluid changed to Water
1995-08-10 Well Type changed to Injection
2012-06-30 Well Fluid changed to Water
2012-06-30 Well Mode changed to Suspended
2012-06-30 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-01-30 290.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-14 Perforation 1859.00 1859.50 7
1985-03-15 Acid Treatment 1859.00 1859.50 0
1992-11-26 Acid Treatment 1859.00 1859.50 0
1995-07-26 Cement Squeeze 1859.00 1859.50 0
1995-07-29 Perforation 1862.00 1865.50 18
1995-08-01 Acid Treatment 1862.00 1865.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2222 0.0 0.0 0.0
1986 3540 0.0 0.0 0.0
1987 3056 0.0 0.0 0.0
1988 2540 0.0 0.0 0.0
1989 3686 0.0 0.0 0.0
1990 5774 0.0 0.0 0.0
1991 7268 0.0 0.0 0.0
1992 7795 0.0 0.0 0.0
1993 7852 0.0 0.0 0.0
1994 8293 0.0 0.0 0.0
1995 4203 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0

For data sources see[6]

References