If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404253406003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.484304,"lon":-113.520325,"icon":""}]} |
Location: 00/06-34-040-25W4/3 | |
Location Alias: 00/06-34-40-25 W4M | |
Location Alias 2: 00/06-34-040-25 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 25 | |
Section: 34 | |
County/Municipality: Lacombe County | |
Well Name: GLENCOE CHIGWELL 6-34-40-25 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0126318 | |
License Date: 1987-04-23 | |
License Status: Issued | |
Spud Date: 1987-05-25 | |
Final Drill Date: 1987-06-05 | |
Well Total Depth: 1987.00 m | |
Surface Hole Latitude: 52.484304 | |
Surface Hole Longitude: -113.520325 |
Date | Event |
---|---|
1987-04-23 | Obtained License |
1987-05-27 | Surface Casing Operation Performed |
1987-06-05 | Finished Drilling |
1987-06-05 | Well Log Performed |
1987-06-05 | Well Mode changed to Drilled and Cased |
1987-06-06 | Well Log Performed |
1987-06-07 | Drill Stem Test Performed |
1987-06-09 | Production Casing Operation Performed |
1987-06-09 | Rig Released |
1987-08-09 | Perforation Treatment Performed - Jet Perforation |
1987-08-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-08-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-01-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-01-22 | Plug Back Performed |
1989-06-07 | Perforation Treatment Performed - Jet Perforation |
2003-06-21 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2003-06-23 | Perforation Treatment Performed - Jet Perforation |
2003-06-24 | Perforation Treatment Performed - Chemical Squeeze |
2003-07-05 | Well Began Production |
2003-07-05 | Well Fluid changed to Gas |
2003-07-05 | Well Mode changed to Flowing |
2005-02-01 | Well Fluid changed to Gas |
2005-02-01 | Well Mode changed to Pumping |
2012-01-01 | Well Fluid changed to Gas |
2012-01-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-08-09 | Perforation | 1911.00 | 1914.00 | 13 |
1987-08-09 | Perforation | 1923.50 | 1926.00 | 13 |
1987-08-10 | Acid Treatment | 1911.00 | 1926.00 | 0 |
1987-08-19 | Acid Treatment | 1923.50 | 1926.00 | 0 |
1989-01-22 | Packing Device Capped w/Cement | 1892.00 | 1900.00 | 0 |
1989-06-07 | Perforation | 1681.00 | 1683.00 | 7 |
2003-06-21 | Casing Patch | 1681.00 | 1683.00 | 0 |
2003-06-23 | Perforation | 1703.00 | 1705.00 | 17 |
2003-06-24 | Chemical Squeeze | 1703.00 | 1705.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 3153 | 0.0 | 0.0 | 0.0 |
2004 | 4563 | 0.0 | 0.0 | 0.0 |
2005 | 8111 | 0.0 | 0.0 | 0.0 |
2006 | 8545 | 0.0 | 0.0 | 0.0 |
2007 | 8687 | 0.0 | 0.0 | 0.0 |
2008 | 8615 | 0.0 | 0.0 | 0.0 |
2009 | 8476 | 0.0 | 0.0 | 0.0 |
2010 | 5255 | 0.0 | 0.0 | 0.0 |
For data sources see[5]