X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405040104000

Well Details

Well ID: 0405040104000
Loading map...
Location: 00/04-01-040-04W5/0
Location Alias: 00/04-01-40-04 W5M
Location Alias 2: 00/04-01-040-04 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 04
Section: 01
County/Municipality: Lacombe County
Well Name: NALR MEDR 4-1-40-4
Operator Name: NAL Resources Limited
License Number: 0023488
License Date: 1962-12-10
License Status: Abandoned
Spud Date: 1962-12-13
Final Drill Date: 1962-12-28
Well Total Depth: 2270.80 m
Surface Hole Latitude: 52.408333
Surface Hole Longitude: -114.454983

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-12-10 Obtained License
1962-12-27 Drill Stem Test Performed
1962-12-28 Finished Drilling
1962-12-30 Drill Stem Test Performed
1962-12-31 Drill Stem Test Performed
1963-01-01 Production Casing Operation Performed
1963-01-23 Perforation Treatment Performed - Bullet Perforation
1963-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-26 Well Mode changed to Drilled and Cased
1976-12-10 Well Began Production
1976-12-10 Well Fluid changed to Gas
1976-12-10 Well Mode changed to Flowing
1979-01-18 Perforation Treatment Performed - Chemical Squeeze
1979-01-29 Perforation Treatment Performed - Chemical Squeeze
1979-05-02 Perforation Treatment Performed - Chemical Squeeze
1981-07-15 Well Fluid changed to Gas
1981-07-15 Well Mode changed to Suspended
1984-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-23 Perforation Treatment Performed - Cement Squeeze
1984-01-27 Perforation Treatment Performed - Jet Perforation
1984-01-31 Perforation Treatment Performed - Chemical Squeeze
1989-11-24 Well Log Performed
1990-03-29 Perforation Treatment Performed - Jet Perforation
1990-03-29 Well Log Performed
1990-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-30 Perforation Treatment Performed - Cement Squeeze
1990-04-03 Perforation Treatment Performed - Jet Perforation
1990-04-03 Well Log Performed
1990-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-12 Perforation Treatment Performed - Fractured
1991-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-21 Perforation Treatment Performed - Jet Perforation
1991-02-26 Perforation Treatment Performed - Cement Squeeze
1991-03-01 Perforation Treatment Performed - Jet Perforation
1991-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-12 Well Fluid changed to Gas
1991-06-12 Well Mode changed to Flowing
1991-08-01 Well Fluid changed to Gas
1991-08-01 Well Mode changed to Suspended
1995-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-14 Perforation Treatment Performed - Jet Perforation
1995-11-14 Plug Back Performed
1995-11-14 Well Fluid changed to Gas
1995-11-14 Well Mode changed to Abandoned
1995-11-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-01-23 Bullet Perforation 2207.10 2209.50 13
1990-03-29 Perforation 2223.00 2223.30 80
1990-03-30 Acid Treatment 2206.00 2223.30 0
1990-03-30 Cement Squeeze 2206.00 2223.30 0
1990-04-03 Perforation 2203.00 2210.20 20
1990-04-05 Acid Treatment 2203.00 2210.20 0
1990-04-12 Fracture 2203.00 2210.20 0
1991-02-21 Perforation 2216.10 2217.60 19
1991-02-21 Acid Treatment 2216.10 2217.60 0
1991-02-26 Cement Squeeze 2216.10 2217.60 0
1991-03-01 Perforation 2203.00 2209.00 13
1963-01-25 Acid Treatment 2207.10 2209.50 0
1991-03-04 Acid Treatment 2203.00 2208.00 0
1995-11-14 Packing Device Capped w/Cement 2182.00 2190.00 0
1995-11-14 Perforation 416.00 416.50 13
1995-11-14 Packing Device Capped w/Cement 401.50 431.50 0
1979-01-18 Chemical Squeeze 2207.10 2209.50 0
1979-01-29 Chemical Squeeze 2207.10 2209.50 0
1979-05-02 Chemical Squeeze 2207.10 2209.50 0
1984-01-23 Acid Treatment 2207.10 2209.50 0
1984-01-23 Cement Squeeze 2207.10 2209.50 0
1984-01-27 Perforation 2206.00 2209.00 13
1984-01-31 Chemical Squeeze 2206.00 2209.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 792 0.0 0.0 0.0
1977 3045 0.0 0.0 0.0
1978 1260 0.0 0.0 0.0
1979 4543 0.0 0.0 0.0
1980 528 0.0 0.0 0.0
1981 919 0.0 0.0 0.0
1991 997 0.0 0.0 0.0

For data sources see[5]

References