X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405040214000

Well Details

Well ID: 0405040214000
Loading map...
Location: 00/14-02-040-04W5/0
Location Alias: 00/14-02-40-04 W5M
Location Alias 2: 00/14-02-040-04 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 04
Section: 02
County/Municipality: Lacombe County
Well Name: NAL GILBY 14-2-40-4
Operator Name: NAL Resources Limited
License Number: 0126925
License Date: 1987-06-18
License Status: Abandoned
Spud Date: 1987-07-13
Final Drill Date: 1987-08-05
Well Total Depth: 2505.00 m
Surface Hole Latitude: 52.418215
Surface Hole Longitude: -114.472379

For data sources see[1][2]

Well History

Date Event
1987-06-18 Obtained License
1987-07-16 Surface Casing Operation Performed
1987-08-05 Finished Drilling
1987-08-07 Drill Stem Test Performed
1987-08-07 Well Log Performed
1987-08-09 Drill Stem Test Performed
1987-08-10 Drill Stem Test Performed
1987-08-12 Production Casing Operation Performed
1987-08-12 Rig Released
1987-09-23 Perforation Treatment Performed - Jet Perforation
1987-09-23 Well Log Performed
1987-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-09 Well Mode changed to Drilled and Cased
1990-05-30 Well Log Performed
1990-05-31 Perforation Treatment Performed - Cement Squeeze
1990-05-31 Plug Back Performed
1990-06-03 Well Log Performed
1990-06-04 Perforation Treatment Performed - Jet Perforation
1990-06-04 Well Log Performed
1990-06-05 Perforation Treatment Performed - Cement Squeeze
1990-06-08 Well Log Performed
1990-06-09 Perforation Treatment Performed - Jet Perforation
1990-06-10 Perforation Treatment Performed - Fractured
1990-06-10 Well Log Performed
1990-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-13 Well Log Performed
1990-06-14 Perforation Treatment Performed - Cement Squeeze
1990-06-17 Perforation Treatment Performed - Jet Perforation
1990-06-17 Well Log Performed
1990-06-18 Perforation Treatment Performed - Fractured
1990-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-01 Well Began Production
1990-07-01 Well Fluid changed to Crude Oil
1990-07-01 Well Mode changed to Pumping
1990-10-01 Well Fluid changed to Crude Oil
1990-10-01 Well Mode changed to Suspended
1997-12-02 Well Log Performed
1997-12-04 Perforation Treatment Performed - Jet Perforation
1997-12-04 Well Log Performed
2003-07-11 Well Log Performed
2003-07-13 Well Log Performed
2003-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-14 Plug Back Performed
2003-07-14 Well Fluid changed to Crude Oil
2003-07-14 Well Log Performed
2003-07-14 Well Mode changed to Abandoned Zone
2003-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-15 Plug Back Performed
2003-07-15 Well Log Performed
2003-07-17 Perforation Treatment Performed - Jet Perforation
2003-07-17 Well Log Performed
2003-07-18 Perforation Treatment Performed - Fractured
2004-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-24 Plug Back Performed
2004-02-24 Well Log Performed
2004-10-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-09-23 Perforation 2266.00 2277.00 7
1990-06-10 Fracture 2278.50 2281.00 0
1990-06-11 Acid Treatment 2278.50 2281.00 0
1990-06-14 Cement Squeeze 2266.00 2281.00 0
1990-06-17 Perforation 2264.00 2265.20 13
1990-06-17 Perforation 2266.00 2267.60 13
1990-06-18 Fracture 2264.00 2267.60 0
1990-06-20 Acid Treatment 2264.00 2267.60 0
1997-12-04 Perforation 2020.00 2024.00 17
2003-07-14 Packing Device Capped w/Cement 2247.00 2255.00 0
2003-07-15 Packing Device Capped w/Cement 2002.00 2010.00 0
1987-09-23 Perforation 2278.50 2281.00 7
2003-07-17 Perforation 1731.00 1733.00 17
2003-07-18 Fracture 1731.00 1733.00 0
2004-02-24 Packing Device Capped w/Cement 1718.00 1726.00 0
1987-09-23 Perforation 2289.00 2297.00 7
1987-09-24 Acid Treatment 2266.00 2297.00 0
1990-05-31 Cement Squeeze 2278.50 2281.00 0
1990-06-04 Perforation 2268.00 2269.00 7
1990-06-04 Perforation 2281.00 2282.00 7
1990-06-05 Cement Squeeze 2266.00 2282.00 0
1990-06-09 Perforation 2278.50 2281.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 1488 0.0 0.0 0.0

For data sources see[5]

References