X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405041508000

Well Details

Well ID: 0405041508000
Loading map...
Location: 00/08-15-040-04W5/0
Location Alias: 00/08-15-40-04 W5M
Location Alias 2: 00/08-15-040-04 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 04
Section: 15
County/Municipality: Lacombe County
Well Name: VELVET GILBY 8-15-40-4
Operator Name: Velvet Energy Ltd.
License Number: 0436288
License Date: 2011-08-24
License Status: Abandoned
Spud Date: 2011-09-08
Final Drill Date: 2011-10-03
Well Total Depth: 3664.00 m
Surface Hole Latitude: 52.438766
Surface Hole Longitude: -114.503608

For data sources see[1][2]

Well History

Date Event
2011-08-24 Obtained License
2011-09-12 Surface Casing Operation Performed
2011-09-13 Direction Drilling Operation Performed - Deviate
2011-09-21 Direction Drilling Operation Performed - Horizontal
2011-09-23 Intermediate Casing Operation Performed
2011-09-23 Well Log Performed
2011-10-03 Finished Drilling
2011-10-03 Well Mode changed to Drilled and Cased
2011-10-06 Production Casing Operation Performed
2011-10-07 Rig Released
2011-10-17 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-06 Plug Back Performed
2012-06-06 Well Mode changed to Abandoned Zone
2014-08-11 Well Log Performed
2014-08-14 Well Abandoned
2014-08-14 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-13 717.61 Deviate (5 - 79 degrees)
2011-09-21 2463.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-17 Multi-Stage Fracture 3637.70 3637.80 0
2011-11-05 Multi-Stage Fracture 2946.90 2947.00 0
2011-11-05 Multi-Stage Fracture 2877.20 2877.30 0
2011-11-05 Multi-Stage Fracture 2794.50 2794.60 0
2011-11-05 Multi-Stage Fracture 2724.80 2724.90 0
2011-11-05 Multi-Stage Fracture 2655.00 2655.10 0
2011-11-05 Multi-Stage Fracture 2585.30 2585.40 0
2012-06-06 Packing Device Capped w/Cement 2499.30 2500.80 0
2011-10-17 Multi-Stage Fracture 3574.30 3574.40 0
2011-10-17 Multi-Stage Fracture 3517.40 3517.50 0
2011-10-17 Multi-Stage Fracture 3460.60 3460.70 0
2011-10-17 Multi-Stage Fracture 3390.90 3391.00 0
2011-10-18 Multi-Stage Fracture 3308.30 3308.40 0
2011-10-18 Multi-Stage Fracture 3238.60 3238.70 0
2011-10-19 Multi-Stage Fracture 3168.90 3169.00 0
2011-11-05 Multi-Stage Fracture 3016.60 3016.70 0

For data sources see[5]



References