X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405051816002

Well Details

Well ID: 0405051816002
Loading map...
Location: 00/16-18-040-05W5/2
Location Alias: 00/16-18-40-05 W5M
Location Alias 2: 00/16-18-040-05 W5/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 05
Section: 18
County/Municipality: Clearwater County
Well Name: CAMBERLY WILLGR 16-18-40-5
Operator Name: Harvest Operations Corp.
License Number: 0060008
License Date: 1976-09-01
License Status: Suspension
Spud Date: 1976-09-15
Final Drill Date: 1976-10-02
Well Total Depth: 2164.10 m
Surface Hole Latitude: 52.448193
Surface Hole Longitude: -114.700732

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-09-01 Obtained License
1976-10-02 Finished Drilling
1976-10-02 Well Mode changed to Drilled and Cased
1976-10-04 Production Casing Operation Performed
1976-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-25 Perforation Treatment Performed - Jet Perforation
1977-01-09 Well Began Production
1977-01-09 Well Fluid changed to Crude Oil
1977-01-09 Well Mode changed to Flowing
1977-02-25 Perforation Treatment Performed - Jet Perforation
1977-03-01 Well Fluid changed to Crude Oil
1977-03-01 Well Mode changed to Pumping
1979-09-28 Perforation Treatment Performed - Fractured
1979-10-18 Perforation Treatment Performed - Selective Jet Perforations
1983-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-24 Well Log Performed
1991-02-25 Well Log Performed
1991-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-02-26 Plug Back Performed
1991-02-26 Well Fluid changed to Crude Oil
1991-02-26 Well Mode changed to Pumping
2014-09-01 Well Fluid changed to Crude Oil
2014-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-11-25 Perforation 2146.10 2148.50 13
1976-11-25 Acid Treatment 2146.10 2148.50 0
1977-02-25 Perforation 1830.60 1833.10 13
1979-09-28 Fracture 2146.10 2148.50 0
1979-10-18 Selective Jet Perforations 2114.70 2114.70 0
1983-02-09 Acid Treatment 1830.60 1833.10 0
1991-02-26 Packing Device Capped w/Cement 1838.00 1841.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 6811 0.0 0.0 0.0
1978 8623 0.0 0.0 0.0
1979 7289 0.0 0.0 0.0
1980 7421 0.0 0.0 0.0
1981 8189 0.0 0.0 0.0
1982 8303 0.0 0.0 0.0
1983 8423 0.0 0.0 0.0
1984 8496 0.0 0.0 0.0
1985 8285 0.0 0.0 0.0
1986 8584 0.0 0.0 0.0
1987 8267 0.0 0.0 0.0
1988 8639 0.0 0.0 0.0
1989 8639 0.0 0.0 0.0
1990 8207 0.0 0.0 0.0
1991 8410 0.0 0.0 0.0
1992 8111 0.0 0.0 0.0
1993 8661 0.0 0.0 0.0
1994 8015 0.0 0.0 0.0
1995 8663 0.0 0.0 0.0
1996 8697 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 6107 0.0 0.0 0.0
1999 1104 0.0 0.0 0.0
2000 3120 0.0 0.0 0.0
2001 4631 0.0 0.0 0.0
2002 8159 0.0 0.0 0.0
2003 7871 0.0 0.0 0.0
2004 8759 0.0 0.0 0.0
2005 8663 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 5831 0.0 0.0 0.0
2009 2352 0.0 0.0 0.0
2010 8543 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8567 0.0 0.0 0.0
2014 2100 0.0 0.0 0.0

For data sources see[5]

References