X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405080710022

Well Details

Well ID: 0405080710022
Loading map...
Location: 02/10-07-040-08W5/2
Location Alias: 02/10-07-40-08 W5M
Location Alias 2: 02/10-07-040-08 W5/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 08
Section: 07
County/Municipality: Clearwater County
Well Name: SECURE FERRIER 10-7-40-8
Operator Name: Secure Energy Services Inc.
License Number: 0446634
License Date: 2012-06-19
License Status: Amended
Spud Date: 2013-09-22
Final Drill Date: 2013-09-29
Well Total Depth: 3455.80 m
Surface Hole Latitude: 52.430851
Surface Hole Longitude: -115.138018

For data sources see[1][2]

Well History

Date Event
2012-06-19 Obtained License
2013-09-29 Finished Drilling
2013-09-29 Well Mode changed to Drilled and Cased
2013-10-04 Well Log Performed
2013-10-06 Liner Casing Operation Performed
2013-10-07 Rig Released
2013-10-21 Perforation Treatment Performed - Jet Perforation
2013-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-05-01 Well Began Injection
2015-05-01 Well Fluid changed to Water
2015-05-01 Well Type changed to Disposal
2018-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-09-22 Precision Drilling Corporation 422 3457 Drill To LD

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-10-21 Perforation 3428.00 3429.00 17
2018-10-26 Acid Treatment 3428.00 3429.00 0
2018-10-26 Acid Treatment 3421.00 3428.00 0
2018-10-26 Acid Treatment 3414.00 3421.00 0
2019-01-06 Acid Treatment 3428.00 3429.00 0
2019-01-06 Acid Treatment 3421.00 3428.00 0
2019-01-06 Acid Treatment 3414.00 3421.00 0
2019-01-30 Acid Treatment 3428.00 3429.00 0
2019-01-30 Acid Treatment 3421.00 3428.00 0
2019-01-30 Acid Treatment 3414.00 3421.00 0
2019-03-18 Acid Treatment 3428.00 3429.00 0
2013-10-21 Perforation 3421.00 3428.00 17
2019-03-18 Acid Treatment 3421.00 3428.00 0
2019-03-18 Acid Treatment 3414.00 3421.00 0
2019-04-17 Acid Treatment 3428.00 3429.00 0
2019-04-17 Acid Treatment 3421.00 3428.00 0
2019-04-17 Acid Treatment 3414.00 3421.00 0
2019-06-06 Acid Treatment 3428.00 3429.00 0
2019-06-06 Acid Treatment 3421.00 3428.00 0
2019-06-06 Acid Treatment 3414.00 3421.00 0
2019-09-24 Acid Treatment 3428.00 3429.00 0
2019-09-24 Acid Treatment 3421.00 3428.00 0
2013-10-21 Perforation 3414.00 3421.00 17
2019-09-24 Acid Treatment 3414.00 3421.00 0
2019-10-18 Acid Treatment 3428.00 3429.00 0
2019-10-18 Acid Treatment 3421.00 3428.00 0
2019-10-18 Acid Treatment 3414.00 3421.00 0
2020-01-07 Acid Treatment 3428.00 3429.00 0
2020-01-07 Acid Treatment 3421.00 3428.00 0
2020-01-07 Acid Treatment 3414.00 3421.00 0
2013-10-24 Acid Treatment 3428.00 3429.00 0
2013-10-24 Acid Treatment 3421.00 3428.00 0
2013-10-24 Acid Treatment 3414.00 3421.00 0
2018-07-26 Acid Treatment 3428.00 3429.00 0
2018-07-26 Acid Treatment 3421.00 3428.00 0
2018-07-26 Acid Treatment 3414.00 3421.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-09-22 No Incident Encountered 0.00 0.00
2013-10-21 No Incident Encountered 0.00 0.00
2018-07-26 No Incident Encountered 0.00 0.00
2018-10-26 No Incident Encountered 0.00 0.00
2019-01-06 No Incident Encountered 0.00 0.00
2019-01-30 No Incident Encountered 0.00 0.00
2019-03-18 No Incident Encountered 0.00 0.00
2019-04-17 No Incident Encountered 0.00 0.00
2019-06-06 No Incident Encountered 0.00 0.00
2019-09-24 No Incident Encountered 0.00 0.00
2019-10-18 No Incident Encountered 0.00 0.00
2020-01-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References