If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0405090108002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.411748,"lon":-115.158142,"icon":""}]} |
Location: 00/08-01-040-09W5/2 | |
Location Alias: 00/08-01-40-09 W5M | |
Location Alias 2: 00/08-01-040-09 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 5 | |
Range: 09 | |
Section: 01 | |
County/Municipality: Clearwater County | |
Well Name: WREC ET AL FERRIER 8-1-40-9 | |
Operator Name: Enerplus Corporation | |
License Number: 0092169 | |
License Date: 1981-09-11 | |
License Status: Issued | |
Spud Date: 1981-09-24 | |
Final Drill Date: 1981-11-06 | |
Well Total Depth: 2975.00 m | |
Surface Hole Latitude: 52.411748 | |
Surface Hole Longitude: -115.158142 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-09-11 | Obtained License |
1981-10-28 | Drill Stem Test Performed |
1981-11-06 | Finished Drilling |
1981-11-09 | Production Casing Operation Performed |
1982-06-01 | Perforation Treatment Performed - Jet Perforation |
1982-06-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-06-08 | Perforation Treatment Performed - Jet Perforation |
1982-06-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-06-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-06-16 | Perforation Treatment Performed - Jet Perforation |
1982-06-17 | Perforation Treatment Performed - Fractured |
1990-03-02 | Perforation Treatment Performed - Jet Perforation |
1990-03-05 | Perforation Treatment Performed - Jet Perforation |
1990-03-19 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
1990-03-20 | Perforation Treatment Performed - Cement Squeeze |
1990-03-20 | Plug Back Performed |
1990-03-26 | Perforation Treatment Performed - Fractured |
1990-04-06 | Well Mode changed to Drilled and Cased |
1994-02-11 | Well Began Production |
1994-02-11 | Well Fluid changed to Gas |
1994-02-11 | Well Mode changed to Flowing |
2019-04-03 | Well Fluid changed to Gas |
2019-04-03 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-06-01 | Perforation | 2942.00 | 2944.00 | 13 |
1982-06-08 | Perforation | 2891.00 | 2895.00 | 7 |
1982-06-10 | Acid Treatment | 2848.50 | 2895.00 | 0 |
1982-06-15 | Packing Device Capped w/Cement | 2389.00 | 2395.00 | 0 |
1982-06-16 | Perforation | 2293.50 | 2294.00 | 13 |
1982-06-16 | Perforation | 2295.00 | 2298.00 | 13 |
1982-06-17 | Fracture | 2293.50 | 2298.00 | 0 |
1990-03-02 | Perforation | 2848.50 | 2849.50 | 7 |
1990-03-02 | Perforation | 2850.50 | 2851.00 | 7 |
1990-03-02 | Perforation | 2851.50 | 2852.00 | 7 |
1990-03-02 | Perforation | 2866.00 | 2867.00 | 7 |
1982-06-03 | Acid Treatment | 2942.00 | 2944.00 | 0 |
1990-03-02 | Perforation | 2874.50 | 2875.50 | 7 |
1990-03-02 | Perforation | 2879.00 | 2882.50 | 7 |
1990-03-02 | Perforation | 2884.00 | 2885.00 | 7 |
1990-03-02 | Perforation | 2891.00 | 2895.00 | 7 |
1990-03-05 | Perforation | 2941.00 | 2944.00 | 13 |
1990-03-19 | Casing Patch | 2293.50 | 2298.00 | 0 |
1990-03-20 | Cement Squeeze | 2848.50 | 2895.00 | 0 |
1990-03-26 | Fracture | 2941.00 | 2944.00 | 0 |
1982-06-08 | Perforation | 2848.50 | 2849.50 | 7 |
1982-06-08 | Perforation | 2850.50 | 2851.00 | 7 |
1982-06-08 | Perforation | 2851.50 | 2852.00 | 7 |
1982-06-08 | Perforation | 2866.00 | 2867.00 | 7 |
1982-06-08 | Perforation | 2874.50 | 2875.50 | 7 |
1982-06-08 | Perforation | 2879.00 | 2882.50 | 7 |
1982-06-08 | Perforation | 2884.00 | 2885.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 4584 | 0.0 | 0.0 | 0.0 |
1995 | 6847 | 0.0 | 0.0 | 0.0 |
1996 | 8284 | 0.0 | 0.0 | 0.0 |
1997 | 8268 | 0.0 | 0.0 | 0.0 |
1998 | 8330 | 0.0 | 0.0 | 0.0 |
1999 | 7245 | 0.0 | 0.0 | 0.0 |
2000 | 8570 | 0.0 | 0.0 | 0.0 |
2001 | 8416 | 0.0 | 0.0 | 0.0 |
2002 | 8426 | 0.0 | 0.0 | 0.0 |
2003 | 8520 | 0.0 | 0.0 | 0.0 |
2004 | 8239 | 0.0 | 0.0 | 0.0 |
2005 | 8196 | 0.0 | 0.0 | 0.0 |
2006 | 7967 | 0.0 | 0.0 | 0.0 |
2007 | 8640 | 0.0 | 0.0 | 0.0 |
2008 | 8318 | 0.0 | 0.0 | 0.0 |
2009 | 8244 | 0.0 | 0.0 | 0.0 |
2010 | 8260 | 0.0 | 0.0 | 0.0 |
2011 | 8712 | 0.0 | 0.0 | 0.0 |
2012 | 8566 | 0.0 | 0.0 | 0.0 |
2013 | 8044 | 0.0 | 0.0 | 0.0 |
2014 | 7145 | 0.0 | 0.0 | 0.0 |
2015 | 7936 | 0.0 | 0.0 | 0.0 |
2016 | 8274 | 0.0 | 0.0 | 0.0 |
2017 | 8239 | 0.0 | 0.0 | 0.0 |
2018 | 2071 | 0.0 | 0.0 | 0.0 |
For data sources see[5]