If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0405090201000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.410223,"lon":-115.182353,"icon":""}]} |
| Location: 00/01-02-040-09W5/0 | |
| Location Alias: 00/01-02-40-09 W5M | |
| Location Alias 2: 00/01-02-040-09 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 040 | |
| Meridian: 5 | |
| Range: 09 | |
| Section: 02 | |
| County/Municipality: Clearwater County | |
| Well Name: PC FERRIER 1-2-40-9 | |
| Operator Name: Response Energy Corporation | |
| License Number: 0196953 | |
| License Date: 1997-01-21 | |
| License Status: Issued | |
| Spud Date: 1997-01-24 | |
| Final Drill Date: 1997-03-15 | |
| Well Total Depth: 3038.00 m | |
| Surface Hole Latitude: 52.410223 | |
| Surface Hole Longitude: -115.182353 |
| Date | Event |
|---|---|
| 1997-01-21 | Obtained License |
| 1997-01-27 | Surface Casing Operation Performed |
| 1997-02-11 | Drill Stem Test Performed |
| 1997-02-16 | Kick Occurred |
| 1997-02-16 | Lost Circulation Occurred |
| 1997-02-22 | Kick Occurred |
| 1997-02-23 | Well Log Performed |
| 1997-02-24 | Lost Circulation Occurred |
| 1997-02-25 | Kick Occurred |
| 1997-02-25 | Lost Circulation Occurred |
| 1997-03-01 | Intermediate Casing Operation Performed |
| 1997-03-15 | Finished Drilling |
| 1997-03-15 | Well Log Performed |
| 1997-03-15 | Well Mode changed to Drilled and Cased |
| 1997-03-16 | Well Log Performed |
| 1997-03-17 | Drill Stem Test Performed |
| 1997-03-19 | Liner Casing Operation Performed |
| 1997-03-20 | Rig Released |
| 1997-05-18 | Well Log Performed |
| 1997-05-21 | Perforation Treatment Performed - Jet Perforation |
| 1997-05-21 | Well Log Performed |
| 1997-05-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-05-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-05-27 | Perforation Treatment Performed - Jet Perforation |
| 1997-05-27 | Plug Back Performed |
| 1997-05-27 | Well Log Performed |
| 1997-05-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-05-31 | Perforation Treatment Performed - Fractured |
| 1997-06-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-06-06 | Perforation Treatment Performed - Jet Perforation |
| 1997-06-06 | Plug Back Performed |
| 1997-06-06 | Well Log Performed |
| 1997-06-07 | Well Log Performed |
| 1997-06-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-06-13 | Perforation Treatment Performed - Fractured |
| 1997-06-19 | Well Began Production |
| 1997-06-19 | Well Fluid changed to Crude Oil |
| 1997-06-19 | Well Mode changed to Flowing |
| 1999-09-10 | Well Fluid changed to Crude Oil |
| 1999-09-10 | Well Mode changed to Pumping |
| 2004-02-03 | Well Fluid changed to Crude Oil |
| 2004-02-03 | Well Mode changed to Suspended |
| 2013-11-08 | Well Fluid changed to Crude Oil |
| 2013-11-08 | Well Mode changed to Pumping |
| 2018-10-24 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1997-05-21 | Perforation | 2978.00 | 2979.00 | 13 |
| 1997-06-06 | Perforation | 2500.00 | 2505.00 | 18 |
| 1997-06-11 | Acid Treatment | 2500.00 | 2505.00 | 0 |
| 1997-06-13 | Fracture | 2500.00 | 2505.00 | 0 |
| 2018-10-24 | Multi-Stage Fracture | 2498.00 | 2500.00 | 0 |
| 2018-10-24 | Multi-Stage Fracture | 2501.00 | 2503.00 | 0 |
| 2018-10-24 | Multi-Stage Fracture | 2503.00 | 2505.00 | 0 |
| 1997-05-21 | Perforation | 2983.00 | 2984.50 | 13 |
| 1997-05-21 | Perforation | 2987.00 | 2989.00 | 13 |
| 1997-05-24 | Acid Treatment | 2978.00 | 2989.00 | 0 |
| 1997-05-27 | Packing Device Capped w/Cement | 2964.00 | 2972.00 | 0 |
| 1997-05-27 | Perforation | 2929.50 | 2932.50 | 13 |
| 1997-05-31 | Acid Treatment | 2929.50 | 2932.50 | 0 |
| 1997-05-31 | Fracture | 2929.50 | 2932.50 | 0 |
| 1997-06-06 | Packing Device Capped w/Cement | 2914.00 | 2922.00 | 0 |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2018-10-24 | 2018-10-24 | 0 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Kerosene | 8008-20-6 | 100 | 100 | N/A |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1997 | 661 | 0.0 | 0.0 | 0.0 |
| 1998 | 1508 | 0.0 | 0.0 | 0.0 |
| 1999 | 2374 | 0.0 | 0.0 | 0.0 |
| 2000 | 7510 | 0.0 | 0.0 | 0.0 |
| 2001 | 8481 | 0.0 | 0.0 | 0.0 |
| 2002 | 6515 | 0.0 | 0.0 | 0.0 |
| 2013 | 879 | 0.0 | 0.0 | 0.0 |
| 2014 | 8407 | 0.0 | 0.0 | 0.0 |
| 2015 | 8250 | 0.0 | 0.0 | 0.0 |
| 2016 | 7869 | 0.0 | 0.0 | 0.0 |
| 2017 | 7240 | 0.0 | 0.0 | 0.0 |
| 2018 | 3508 | 0.0 | 0.0 | 0.0 |
| 2019 | 3473 | 0.0 | 0.0 | 0.0 |
| 2020 | 1512 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1997-02-16 | Kick | 2509.00 | 2509.50 |
| 1997-02-16 | Lost Circulation | 2509.00 | 2509.00 |
| 1997-02-22 | Kick | 2548.00 | 2548.00 |
| 1997-02-24 | Lost Circulation | 2587.00 | 2587.00 |
| 1997-02-25 | Kick | 2587.00 | 2594.00 |
| 1997-02-25 | Lost Circulation | 2595.00 | 2625.00 |
| 2018-10-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]