X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414010310022

Well Details

Well ID: 0414010310022
Loading map...
Location: 02/10-03-041-01W4/2
Location Alias: 02/10-03-41-01 W4M
Location Alias 2: 02/10-03-041-01 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 03
County/Municipality: Municipal District of Provost No. 52
Well Name: 1994450AB HAYTER 10-3-41-1
Operator Name: AlphaBow Energy Ltd.
License Number: 0196087
License Date: 1997-01-06
License Status: Abandoned
Spud Date: 1997-09-23
Final Drill Date: 1997-09-27
Well Total Depth: 1060.00 m
Surface Hole Latitude: 52.500296
Surface Hole Longitude: -110.070385

For data sources see[1][2]

Well History

Date Event
1997-01-06 Obtained License
1997-09-23 Direction Drilling Operation Performed - Deviate
1997-09-23 Surface Casing Operation Performed
1997-09-27 Finished Drilling
1997-09-27 Well Log Performed
1997-09-27 Well Mode changed to Drilled and Cased
1997-09-28 Production Casing Operation Performed
1997-09-28 Rig Released
1997-10-01 Well Log Performed
1997-10-29 Perforation Treatment Performed - Jet Perforation
1997-10-29 Well Log Performed
2000-03-09 Perforation Treatment Performed - Jet Perforation
2000-03-09 Well Mode changed to Drilled and Cased
2000-03-29 Well Mode changed to Drilled and Cased
2002-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-05 Perforation Treatment Performed - Jet Perforation
2002-03-05 Plug Back Performed
2002-03-05 Well Log Performed
2002-03-05 Well Mode changed to Abandoned Zone
2010-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-13 Plug Back Performed
2011-02-07 Well Abandoned
2011-02-07 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-09-23 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-10-29 Perforation 952.50 954.50 26
2000-03-09 Perforation 1009.00 1012.00 13
2002-03-05 Perforation 952.50 954.50 17
2002-03-05 Packing Device Capped w/Cement 998.00 1006.00 0
2010-12-13 Packing Device Capped w/Cement 934.50 942.50 0

For data sources see[5]



References