X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414012004020

Well Details

Well ID: 0414012004020
Loading map...
Location: 02/04-20-041-01W4/0
Location Alias: 02/04-20-41-01 W4M
Location Alias 2: 02/04-20-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 20
County/Municipality: Municipal District of Wainwright No. 61
Well Name: RSO 102 HZ HAYTER 4-20-41-1
Operator Name: Rifle Shot Oil Corp.
License Number: 0479832
License Date: 2016-07-06
License Status: Issued
Spud Date: 2016-11-19
Final Drill Date: 2016-11-22
Well Total Depth: 1492.00 m
Surface Hole Latitude: 52.530785
Surface Hole Longitude: -110.116361

For data sources see[1][2]

Well History

Date Event
2016-07-06 Obtained License
2016-11-19 Surface Casing Operation Performed
2016-11-20 Direction Drilling Operation Performed - Deviate
2016-11-22 Direction Drilling Operation Performed - Horizontal
2016-11-22 Finished Drilling
2016-11-22 Well Log Performed
2016-11-22 Well Mode changed to Drilled and Cased
2016-11-23 Production Casing Operation Performed
2016-11-23 Rig Released
2016-11-27 Perforation Treatment Performed - Jet Perforation
2016-12-21 Well Began Production
2016-12-21 Well Fluid changed to Crude Oil
2016-12-21 Well Mode changed to Flowing
2017-09-28 Perforation Treatment Performed - Jet Perforation
2019-10-05 Perforation Treatment Performed - Jet Perforation
2019-10-06 Perforation Treatment Performed - Cement Squeeze
2019-10-07 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-11-19 Savanna Drilling Corp. 432 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-11-20 520.60 Deviate (5 - 79 degrees)
2016-11-22 1062.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-11-27 Perforation 1385.00 1470.00 7
2017-09-28 Perforation 1245.00 1325.00 7
2019-10-05 Perforation 1224.00 1225.00 20
2019-10-06 Cement Squeeze 1224.00 1225.00 0
2019-10-07 Perforation 1105.00 1210.00 7

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 246 0.0 0.0 0.0
2017 8594 0.0 0.0 0.0
2018 8477 0.0 0.0 0.0
2019 8501 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-11-23 No Incident Encountered 0.00 0.00
2016-11-25 No Incident Encountered 0.00 0.00
2017-09-30 No Incident Encountered 0.00 0.00
2019-10-04 No Incident Encountered 0.00 0.00

For data sources see[8]

References