If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414012909B00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.557942,"lon":-110.1066,"icon":""}]} |
Location: B0/09-29-041-01W4/0 | |
Location Alias: B0/09-29-41-01 W4M | |
Location Alias 2: B0/09-29-041-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 01 | |
Section: 29 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: 1994450AB HAYTER 9-29-41-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0127811 | |
License Date: 1987-08-11 | |
License Status: Abandoned | |
Spud Date: 1987-08-30 | |
Final Drill Date: 1987-09-01 | |
Well Total Depth: 807.00 m | |
Surface Hole Latitude: 52.557942 | |
Surface Hole Longitude: -110.106600 |
Date | Event |
---|---|
1987-08-11 | Obtained License |
1987-08-31 | Surface Casing Operation Performed |
1987-09-01 | Finished Drilling |
1987-09-01 | Well Log Performed |
1987-09-01 | Well Mode changed to Drilled and Cased |
1987-09-02 | Production Casing Operation Performed |
1987-09-02 | Rig Released |
1987-09-17 | Perforation Treatment Performed - Jet Perforation |
1987-09-22 | Well Began Production |
1987-09-22 | Well Fluid changed to Crude Oil |
1987-09-22 | Well Mode changed to Pumping |
1995-02-27 | Well Fluid changed to Crude Oil |
1995-02-27 | Well Mode changed to Suspended |
1996-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-07-08 | Plug Back Performed |
1996-09-08 | Well Abandoned |
1996-09-08 | Well Fluid changed to Crude Oil |
1996-09-08 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-09-17 | Perforation | 774.50 | 777.00 | 13 |
1996-07-08 | Packing Device Capped w/Cement | 761.00 | 769.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1987 | 2264 | 0.0 | 0.0 | 0.0 |
1988 | 8463 | 0.0 | 0.0 | 0.0 |
1989 | 8356 | 0.0 | 0.0 | 0.0 |
1990 | 8522 | 0.0 | 0.0 | 0.0 |
1991 | 8726 | 0.0 | 0.0 | 0.0 |
1992 | 8593 | 0.0 | 0.0 | 0.0 |
1993 | 8695 | 0.0 | 0.0 | 0.0 |
1994 | 8490 | 0.0 | 0.0 | 0.0 |
1995 | 1294 | 0.0 | 0.0 | 0.0 |
For data sources see[5]