X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414082010000

Well Details

Well ID: 0414082010000
Loading map...
Location: 00/10-20-041-08W4/0
Location Alias: 00/10-20-41-08 W4M
Location Alias 2: 00/10-20-041-08 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 08
Section: 20
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 10-20-41-8
Operator Name: Cleo Energy Corp.
License Number: 0054478
License Date: 1975-08-01
License Status: Abandoned
Spud Date: 1975-08-09
Final Drill Date: 1975-08-12
Well Total Depth: 892.10 m
Surface Hole Latitude: 52.546251
Surface Hole Longitude: -111.115170

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-08-01 Obtained License
1975-08-12 Drill Stem Test Performed
1975-08-12 Finished Drilling
1975-08-13 Drill Stem Test Performed
1975-08-14 Drill Stem Test Performed
1975-08-15 Production Casing Operation Performed
1975-09-11 Perforation Treatment Performed - Jet Perforation
1975-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-09-15 Perforation Treatment Performed - Fractured
1975-10-26 Well Mode changed to Drilled and Cased
1977-12-20 Well Began Production
1977-12-20 Well Fluid changed to Gas
1977-12-20 Well Mode changed to Flowing
1987-11-19 Perforation Treatment Performed - Jet Perforation
1987-11-19 Well Log Performed
1992-11-01 Well Fluid changed to Gas
1992-11-01 Well Mode changed to Suspended
1999-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-17 Plug Back Performed
1999-03-17 Well Fluid changed to Gas
1999-03-17 Well Log Performed
1999-03-17 Well Mode changed to Abandoned Zone
1999-03-18 Perforation Treatment Performed - Jet Perforation
2010-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-20 Perforation Treatment Performed - Cement Plug
2010-09-20 Plug Back Performed
2010-09-20 Well Log Performed
2017-03-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-11 Perforation 857.70 859.50 7
1975-09-11 Perforation 860.10 863.80 3
1975-09-15 Acid Treatment 857.70 863.80 0
1975-09-15 Fracture 857.70 863.80 0
1987-11-19 Perforation 850.40 851.00 13
1999-03-17 Packing Device Capped w/Cement 832.00 840.00 0
1999-03-18 Perforation 781.50 783.30 14
2010-09-20 Cement Plug 830.50 833.50 0
2010-09-20 Packing Device Capped w/Cement 767.00 775.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 150 0.0 0.0 0.0
1978 4817 0.0 0.0 0.0
1979 2603 0.0 0.0 0.0
1981 7605 0.0 0.0 0.0
1982 8401 0.0 0.0 0.0
1983 2924 0.0 0.0 0.0
1984 8263 0.0 0.0 0.0
1985 7646 0.0 0.0 0.0
1986 5956 0.0 0.0 0.0
1987 6672 0.0 0.0 0.0
1988 7368 0.0 0.0 0.0
1989 2310 0.0 0.0 0.0

For data sources see[5]

References