X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414092411000

Well Details

Well ID: 0414092411000
Loading map...
Location: 00/11-24-041-09W4/0
Location Alias: 00/11-24-41-09 W4M
Location Alias 2: 00/11-24-041-09 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 09
Section: 24
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 11-24-41-9
Operator Name: Cleo Energy Corp.
License Number: 0033709
License Date: 1968-02-20
License Status: Abandoned
Spud Date: 1968-03-12
Final Drill Date: 1968-03-16
Well Total Depth: 896.10 m
Surface Hole Latitude: 52.545803
Surface Hole Longitude: -111.172819

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-02-20 Obtained License
1968-03-16 Finished Drilling
1968-03-18 Production Casing Operation Performed
1968-04-16 Perforation Treatment Performed - Jet Perforation
1968-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-04-18 Perforation Treatment Performed - Jet Perforation
1968-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-04-19 Perforation Treatment Performed - Jet Perforation
1968-05-10 Perforation Treatment Performed - Fractured
1968-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-09-29 Perforation Treatment Performed - Cement Squeeze
1968-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-02 Perforation Treatment Performed - Jet Perforation
1969-05-27 Well Mode changed to Drilled and Cased
1977-12-20 Well Began Production
1977-12-20 Well Fluid changed to Gas
1977-12-20 Well Mode changed to Flowing
1991-06-01 Well Fluid changed to Gas
1991-06-01 Well Mode changed to Suspended
1994-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-03-08 Plug Back Performed
1994-03-09 Perforation Treatment Performed - Cement Plug
1999-11-06 Well Abandoned
1999-11-06 Well Fluid changed to Gas
1999-11-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-04-16 Perforation 860.10 861.10 7
1968-09-29 Cement Squeeze 851.60 863.20 0
1968-10-02 Perforation 851.60 853.40 12
1968-10-02 Acid Treatment 851.60 853.40 0
1994-03-08 Packing Device Capped w/Cement 830.00 838.00 0
1994-03-09 Cement Plug 3.50 9.50 0
1968-04-16 Perforation 862.00 863.20 7
1968-04-17 Acid Treatment 860.10 863.20 0
1968-04-18 Perforation 853.40 855.30 0
1968-04-18 Acid Treatment 853.40 855.30 0
1968-04-19 Perforation 851.60 853.40 0
1968-04-19 Acid Treatment 851.60 853.40 0
1968-05-10 Fracture 851.60 863.20 0
1968-08-19 Packing Device Capped w/Cement 856.50 858.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 240 0.0 0.0 0.0
1978 4926 0.0 0.0 0.0
1979 8294 0.0 0.0 0.0
1980 7716 0.0 0.0 0.0
1981 7590 0.0 0.0 0.0
1982 8546 0.0 0.0 0.0
1983 2986 0.0 0.0 0.0
1984 8620 0.0 0.0 0.0
1985 8575 0.0 0.0 0.0
1986 7723 0.0 0.0 0.0
1987 8688 0.0 0.0 0.0
1988 5794 0.0 0.0 0.0
1989 5516 0.0 0.0 0.0

For data sources see[5]

References