If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414131104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.510387,"lon":-111.774157,"icon":""}]} |
Location: 00/04-11-041-13W4/0 | |
Location Alias: 00/04-11-41-13 W4M | |
Location Alias 2: 00/04-11-041-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 13 | |
Section: 11 | |
County/Municipality: Flagstaff County | |
Well Name: MERLAND PCI KILLAM 4-11-41-13 | |
Operator Name: International Sovereign Energy Corp. | |
License Number: 0106313 | |
License Date: 1984-03-02 | |
License Status: RecCertified | |
Spud Date: 1984-03-05 | |
Final Drill Date: 1984-03-10 | |
Well Total Depth: 1026.00 m | |
Surface Hole Latitude: 52.510387 | |
Surface Hole Longitude: -111.774157 |
Date | Event |
---|---|
1984-03-02 | Obtained License |
1984-03-09 | Drill Stem Test Performed |
1984-03-10 | Finished Drilling |
1984-03-10 | Well Log Performed |
1984-03-11 | Production Casing Operation Performed |
1984-03-12 | Well Mode changed to Drilled and Cased |
1984-03-18 | Well Log Performed |
1984-03-19 | Perforation Treatment Performed - Cement Squeeze |
1984-03-19 | Perforation Treatment Performed - Jet Perforation |
1984-03-21 | Perforation Treatment Performed - Jet Perforation |
1984-04-01 | Well Began Production |
1984-04-01 | Well Fluid changed to Crude Oil |
1984-04-01 | Well Mode changed to Pumping |
1986-06-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-06-23 | Plug Back Performed |
1986-06-23 | Well Fluid changed to Crude Oil |
1986-06-23 | Well Mode changed to Abandoned Zone |
1986-06-24 | Perforation Treatment Performed - Jet Perforation |
1986-06-24 | Well Log Performed |
1994-10-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-11 | Plug Back Performed |
1994-10-17 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-03-19 | Perforation | 972.00 | 972.50 | 13 |
1984-03-19 | Perforation | 963.00 | 963.50 | 13 |
1984-03-19 | Cement Squeeze | 963.00 | 972.50 | 0 |
1984-03-21 | Perforation | 960.50 | 961.50 | 13 |
1986-06-23 | Packing Device Capped w/Cement | 947.00 | 955.00 | 0 |
1986-06-24 | Perforation | 807.00 | 808.00 | 13 |
1994-10-11 | Packing Device Capped w/Cement | 791.00 | 799.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 6418 | 0.0 | 0.0 | 0.0 |
1985 | 6804 | 0.0 | 0.0 | 0.0 |
For data sources see[5]