X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414133501042

Well Details

Well ID: 0414133501042
Loading map...
Location: 04/01-35-041-13W4/2
Location Alias: 04/01-35-41-13 W4M
Location Alias 2: 04/01-35-041-13 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 13
Section: 35
County/Municipality: Flagstaff County
Well Name: RHODIE ET AL 1B BELL 1-35-41-13
Operator Name: Zargon Oil & Gas Ltd.
License Number: 0132661
License Date: 1988-02-26
License Status: Abandoned
Spud Date: 1988-04-20
Final Drill Date: 1988-04-23
Well Total Depth: 969.00 m
Surface Hole Latitude: 52.566363
Surface Hole Longitude: -111.757874

For data sources see[1][2]

Well History

Date Event
1988-02-26 Obtained License
1988-04-21 Direction Drilling Operation Performed - Deviate
1988-04-23 Finished Drilling
1988-04-23 Production Casing Operation Performed
1988-04-23 Rig Released
1988-04-23 Well Log Performed
1988-04-23 Well Mode changed to Drilled and Cased
1988-04-26 Well Log Performed
1988-05-01 Perforation Treatment Performed - Open-Hole Completion
1988-05-02 Perforation Treatment Performed - Cement Plug
1988-05-03 Well Log Performed
1988-06-11 Perforation Treatment Performed - Jet Perforation
1988-06-13 Perforation Treatment Performed - Remedial Casing
1988-06-17 Perforation Treatment Performed - Open-Hole Completion
1988-06-21 Well Began Production
1988-06-21 Well Fluid changed to Crude Oil
1988-06-21 Well Mode changed to Pumping
1995-01-31 Well Fluid changed to Crude Oil
1995-01-31 Well Mode changed to Suspended
1995-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-26 Plug Back Performed
1995-10-26 Well Abandoned
1995-10-26 Well Fluid changed to Crude Oil
1995-10-26 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-04-21 254.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-05-01 Open Hole/Barefoot Completion 946.00 969.00 0
1988-05-02 Cement Plug 952.70 969.00 0
1988-06-11 Perforation 252.00 252.60 13
1988-06-13 Remedial Casing Cementing 252.00 252.60 0
1988-06-17 Open Hole/Barefoot Completion 946.00 952.70 0
1995-10-26 Packing Device Capped w/Cement 928.70 936.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 4491 0.0 0.0 0.0
1989 8729 0.0 0.0 0.0
1990 8707 0.0 0.0 0.0
1991 8711 0.0 0.0 0.0
1992 8334 0.0 0.0 0.0
1993 3730 0.0 0.0 0.0

For data sources see[6]

References