If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414150202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.493667,"lon":-112.055351,"icon":""}]} |
Location: 00/02-02-041-15W4/0 | |
Location Alias: 00/02-02-41-15 W4M | |
Location Alias 2: 00/02-02-041-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 15 | |
Section: 02 | |
County/Municipality: Flagstaff County | |
Well Name: SOC GALAHAD 2-2-41-15 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0406075 | |
License Date: 2008-12-15 | |
License Status: Suspension | |
Spud Date: 2009-02-07 | |
Final Drill Date: 2009-02-10 | |
Well Total Depth: 1077.00 m | |
Surface Hole Latitude: 52.493667 | |
Surface Hole Longitude: -112.055351 |
Date | Event |
---|---|
2008-12-15 | Obtained License |
2009-02-08 | Surface Casing Operation Performed |
2009-02-09 | Direction Drilling Operation Performed - Deviate |
2009-02-10 | Finished Drilling |
2009-02-10 | Well Log Performed |
2009-02-10 | Well Mode changed to Drilled and Cased |
2009-02-11 | Drill Stem Test Performed |
2009-02-12 | Production Casing Operation Performed |
2009-02-12 | Rig Released |
2009-03-19 | Perforation Treatment Performed - Jet Perforation |
2009-03-19 | Well Log Performed |
2009-12-20 | Well Began Production |
2009-12-20 | Well Fluid changed to Crude Oil |
2009-12-20 | Well Mode changed to Pumping |
2016-07-29 | Well Fluid changed to Crude Oil |
2016-07-29 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-02-09 | 643.50 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-03-19 | Perforation | 1043.00 | 1044.00 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 158 | 0.0 | 0.0 | 0.0 |
2010 | 636 | 0.0 | 0.0 | 0.0 |
2011 | 2927 | 0.0 | 0.0 | 0.0 |
2012 | 7835 | 0.0 | 0.0 | 0.0 |
2013 | 7241 | 0.0 | 0.0 | 0.0 |
2014 | 8530 | 0.0 | 0.0 | 0.0 |
2015 | 8400 | 0.0 | 0.0 | 0.0 |
2016 | 4635 | 0.0 | 0.0 | 0.0 |
For data sources see[6]