If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414150514002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.506388,"lon":-112.132053,"icon":""}]} |
Location: 00/14-05-041-15W4/2 | |
Location Alias: 00/14-05-41-15 W4M | |
Location Alias 2: 00/14-05-041-15 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 15 | |
Section: 05 | |
County/Municipality: Flagstaff County | |
Well Name: SOC GALAHAD 14-5-41-15 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0354141 | |
License Date: 2006-03-15 | |
License Status: Suspension | |
Spud Date: 2006-06-06 | |
Final Drill Date: 2006-06-22 | |
Well Total Depth: 1115.00 m | |
Surface Hole Latitude: 52.506388 | |
Surface Hole Longitude: -112.132053 |
Date | Event |
---|---|
2006-03-15 | Obtained License |
2006-06-07 | Surface Casing Operation Performed |
2006-06-22 | Finished Drilling |
2006-06-22 | Well Log Performed |
2006-06-22 | Well Mode changed to Drilled and Cased |
2006-06-23 | Production Casing Operation Performed |
2006-06-24 | Rig Released |
2006-07-07 | Perforation Treatment Performed - Jet Perforation |
2006-07-07 | Well Log Performed |
2006-07-08 | Perforation Treatment Performed - Jet Perforation |
2006-07-09 | Perforation Treatment Performed - Jet Perforation |
2009-06-26 | Well Began Production |
2009-06-26 | Well Fluid changed to Gas |
2009-06-26 | Well Mode changed to Flowing |
2009-06-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-06-27 | Perforation Treatment Performed - Jet Perforation |
2009-06-27 | Plug Back Performed |
2009-06-27 | Well Log Performed |
2011-09-28 | Well Log Performed |
2011-09-29 | Perforation Treatment Performed - Jet Perforation |
2011-09-29 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2012-09-01 | Well Fluid changed to Gas |
2012-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-07-07 | Perforation | 1086.50 | 1087.50 | 17 |
2006-07-07 | Perforation | 1081.70 | 1082.30 | 17 |
2006-07-08 | Perforation | 1079.00 | 1080.00 | 17 |
2006-07-09 | Perforation | 1076.50 | 1077.50 | 17 |
2009-06-27 | Packing Device Capped w/Cement | 1063.00 | 1071.00 | 0 |
2009-06-27 | Perforation | 1048.00 | 1049.50 | 17 |
2011-09-29 | Packing Dev Cpd w/Res-Gyp Cem | 1067.10 | 1070.10 | 0 |
2011-09-29 | Perforation | 1059.00 | 1060.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 4288 | 0.0 | 0.0 | 0.0 |
2010 | 8214 | 0.0 | 0.0 | 0.0 |
2011 | 1712 | 0.0 | 0.0 | 0.0 |
For data sources see[5]