If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0414170513000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.503638,"lon":-112.423139,"icon":""}]} |
| Location: 00/13-05-041-17W4/0 | |
| Location Alias: 00/13-05-41-17 W4M | |
| Location Alias 2: 00/13-05-041-17 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 041 | |
| Meridian: 4 | |
| Range: 17 | |
| Section: 05 | |
| County/Municipality: County of Stettler No. 6 | |
| Well Name: SIGNALTA ET AL RED WILLOW 13-5-41-17 | |
| Operator Name: 1354465 Alberta Ltd. | |
| License Number: 0143562 | |
| License Date: 1990-03-02 | |
| License Status: Amended | |
| Spud Date: 1990-03-03 | |
| Final Drill Date: 1990-03-09 | |
| Well Total Depth: 1237.00 m | |
| Surface Hole Latitude: 52.503638 | |
| Surface Hole Longitude: -112.423139 |
| Date | Event |
|---|---|
| 1990-03-02 | Obtained License |
| 1990-03-03 | Water Flow Occurred |
| 1990-03-04 | Surface Casing Operation Performed |
| 1990-03-05 | Well Log Performed |
| 1990-03-09 | Finished Drilling |
| 1990-03-10 | Drill Stem Test Performed |
| 1990-03-10 | Well Log Performed |
| 1990-03-12 | Production Casing Operation Performed |
| 1990-03-12 | Rig Released |
| 1990-03-15 | Well Log Performed |
| 1990-03-16 | Well Log Performed |
| 1990-03-17 | Perforation Treatment Performed - Jet Perforation |
| 1990-03-17 | Perforation Treatment Performed - Remedial Casing |
| 1990-03-18 | Well Log Performed |
| 1990-03-19 | Perforation Treatment Performed - Jet Perforation |
| 1990-03-19 | Well Log Performed |
| 1990-03-20 | Perforation Treatment Performed - Jet Perforation |
| 1990-03-20 | Well Log Performed |
| 1990-03-21 | Perforation Treatment Performed - Jet Perforation |
| 1990-03-30 | Well Mode changed to Drilled and Cased |
| 1990-09-26 | Well Began Production |
| 1990-09-26 | Well Fluid changed to Gas |
| 1990-09-26 | Well Mode changed to Flowing |
| 1993-05-31 | Well Fluid changed to Gas |
| 1993-05-31 | Well Mode changed to Suspended |
| 1993-10-19 | Well Log Performed |
| 1993-10-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-03-08 | Perforation Treatment Performed - Jet Perforation |
| 1994-03-10 | Well Fluid changed to Gas |
| 1994-03-10 | Well Mode changed to Flowing |
| 1994-11-01 | Well Fluid changed to Gas |
| 1994-11-01 | Well Mode changed to Suspended |
| 1996-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-08-10 | Plug Back Performed |
| 1996-08-10 | Well Fluid changed to Gas |
| 1996-08-10 | Well Mode changed to Abandoned and Re-entered |
| 1996-08-11 | Well Log Performed |
| 1996-08-29 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1990-03-17 | Perforation | 425.00 | 425.40 | 10 |
| 1996-08-10 | Packing Device Capped w/Cement | 1132.00 | 1140.00 | 0 |
| 1990-03-17 | Remedial Casing Cementing | 425.00 | 425.40 | 0 |
| 1990-03-19 | Perforation | 1182.00 | 1183.00 | 13 |
| 1990-03-20 | Perforation | 1171.30 | 1172.80 | 13 |
| 1990-03-21 | Perforation | 1144.00 | 1145.00 | 14 |
| 1993-10-20 | Packing Device Capped w/Cement | 1157.00 | 1165.00 | 0 |
| 1994-03-08 | Perforation | 1171.00 | 1172.80 | 13 |
| 1994-03-08 | Perforation | 1182.00 | 1183.00 | 13 |
| 1996-08-10 | Packing Device Capped w/Cement | 1156.00 | 1164.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1990 | 1919 | 0.0 | 0.0 | 0.0 |
| 1991 | 6075 | 0.0 | 0.0 | 0.0 |
| 1994 | 2102 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1990-03-03 | Water Flow | 88.00 | 1237.00 |
For data sources see[6]