If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414201905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.54071,"lon":-112.878976,"icon":""}]} |
Location: 00/05-19-041-20W4/0 | |
Location Alias: 00/05-19-41-20 W4M | |
Location Alias 2: 00/05-19-041-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 20 | |
Section: 19 | |
County/Municipality: Camrose County | |
Well Name: EMBER BASHAW 5-19-41-20 | |
Operator Name: Ember Resources Inc. | |
License Number: 0085125 | |
License Date: 1980-08-22 | |
License Status: Suspension | |
Spud Date: 1980-08-31 | |
Final Drill Date: 1980-09-11 | |
Well Total Depth: 1401.00 m | |
Surface Hole Latitude: 52.540710 | |
Surface Hole Longitude: -112.878976 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-08-22 | Obtained License |
1980-09-11 | Finished Drilling |
1980-09-13 | Drill Stem Test Performed |
1980-09-15 | Drill Stem Test Performed |
1980-09-16 | Drill Stem Test Performed |
1980-09-18 | Production Casing Operation Performed |
1980-10-09 | Perforation Treatment Performed - Jet Perforation |
1980-10-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-11 | Perforation Treatment Performed - Alcohol Squeeze |
1980-10-14 | Perforation Treatment Performed - Jet Perforation |
1980-10-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-16 | Perforation Treatment Performed - Jet Perforation |
1980-10-20 | Perforation Treatment Performed - Jet Perforation |
1980-10-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-23 | Perforation Treatment Performed - Cement Squeeze |
1980-10-24 | Perforation Treatment Performed - Cement Squeeze |
1980-10-28 | Perforation Treatment Performed - Cement Squeeze |
1980-10-31 | Perforation Treatment Performed - Jet Perforation |
1980-11-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-11-03 | Perforation Treatment Performed - Jet Perforation |
1980-11-05 | Perforation Treatment Performed - Fractured |
1980-11-09 | Well Mode changed to Drilled and Cased |
1985-12-18 | Well Log Performed |
1985-12-20 | Perforation Treatment Performed - Jet Perforation |
1985-12-20 | Well Mode changed to Drilled and Cased |
1997-08-19 | Well Began Production |
1997-08-19 | Well Fluid changed to Gas |
1997-08-19 | Well Mode changed to Flowing |
1997-08-20 | Well Fluid changed to Gas |
1997-08-20 | Well Mode changed to Flowing |
2008-11-21 | Well Log Performed |
2008-11-22 | Perforation Treatment Performed - Jet Perforation |
2008-11-22 | Well Log Performed |
2008-12-01 | Well Fluid changed to Gas |
2008-12-01 | Well Mode changed to Suspended |
2008-12-06 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-10-09 | Perforation | 475.50 | 476.50 | 9 |
1980-10-20 | Perforation | 477.00 | 478.00 | 9 |
1980-10-21 | Acid Treatment | 475.50 | 478.00 | 0 |
1980-10-23 | Cement Squeeze | 351.50 | 352.50 | 0 |
1980-10-24 | Cement Squeeze | 351.50 | 352.50 | 0 |
1980-10-28 | Cement Squeeze | 316.50 | 317.50 | 0 |
1980-10-31 | Perforation | 352.50 | 353.50 | 9 |
1980-11-01 | Acid Treatment | 352.50 | 353.50 | 0 |
1980-11-03 | Perforation | 316.50 | 317.50 | 9 |
1980-11-05 | Fracture | 316.50 | 478.00 | 0 |
1985-12-20 | Perforation | 1351.00 | 1352.00 | 13 |
1980-10-09 | Perforation | 477.00 | 478.00 | 9 |
2008-11-22 | Perforation | 195.00 | 198.00 | 17 |
2008-11-22 | Perforation | 202.50 | 204.00 | 17 |
2008-11-22 | Perforation | 223.00 | 224.00 | 17 |
2008-11-22 | Perforation | 225.00 | 225.50 | 17 |
2008-11-22 | Perforation | 226.00 | 226.50 | 17 |
2008-11-22 | Perforation | 231.00 | 235.00 | 17 |
2008-11-22 | Perforation | 237.50 | 240.00 | 17 |
2008-11-22 | Perforation | 269.00 | 270.00 | 17 |
2008-11-22 | Perforation | 283.00 | 284.00 | 17 |
2008-11-22 | Perforation | 288.50 | 289.00 | 17 |
1980-10-10 | Acid Treatment | 475.50 | 478.00 | 0 |
2008-11-22 | Perforation | 298.00 | 299.00 | 17 |
2008-12-06 | Fracture | 195.00 | 299.00 | 0 |
1980-10-11 | Alchohol Squeeze | 475.50 | 478.00 | 0 |
1980-10-14 | Perforation | 351.50 | 352.50 | 9 |
1980-10-15 | Acid Treatment | 351.50 | 352.50 | 0 |
1980-10-16 | Perforation | 316.50 | 317.50 | 9 |
1980-10-16 | Acid Treatment | 316.50 | 317.50 | 0 |
1980-10-20 | Perforation | 475.50 | 476.00 | 9 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 2104 | 0.0 | 0.0 | 0.0 |
1998 | 2945 | 0.0 | 0.0 | 0.0 |
1999 | 6189 | 0.0 | 0.0 | 0.0 |
2000 | 4893 | 0.0 | 0.0 | 0.0 |
2001 | 8413 | 0.0 | 0.0 | 0.0 |
2002 | 8507 | 0.0 | 0.0 | 0.0 |
2003 | 8598 | 0.0 | 0.0 | 0.0 |
2004 | 8172 | 0.0 | 0.0 | 0.0 |
2005 | 7526 | 0.0 | 0.0 | 0.0 |
2006 | 8299 | 0.0 | 0.0 | 0.0 |
2007 | 8536 | 0.0 | 0.0 | 0.0 |
2008 | 7564 | 0.0 | 0.0 | 0.0 |
For data sources see[5]