If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0414201916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.547914,"lon":-112.864401,"icon":""}]} |
| Location: 00/16-19-041-20W4/0 | |
| Location Alias: 00/16-19-41-20 W4M | |
| Location Alias 2: 00/16-19-041-20 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 041 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 19 | |
| County/Municipality: Camrose County | |
| Well Name: TEAC BASHAW 16-19-41-20 | |
| Operator Name: Trident Exploration (Alberta) Corp. | |
| License Number: 0193846 | |
| License Date: 1996-11-21 | |
| License Status: Abandoned | |
| Spud Date: 1996-12-01 | |
| Final Drill Date: 1996-12-03 | |
| Well Total Depth: 624.00 m | |
| Surface Hole Latitude: 52.547914 | |
| Surface Hole Longitude: -112.864401 |
| Date | Event |
|---|---|
| 1996-11-21 | Obtained License |
| 1996-12-01 | Surface Casing Operation Performed |
| 1996-12-03 | Finished Drilling |
| 1996-12-03 | Well Log Performed |
| 1996-12-03 | Well Mode changed to Drilled and Cased |
| 1996-12-04 | Production Casing Operation Performed |
| 1996-12-04 | Rig Released |
| 1996-12-16 | Perforation Treatment Performed - Jet Perforation |
| 1996-12-23 | Perforation Treatment Performed - Jet Perforation |
| 1996-12-29 | Perforation Treatment Performed - Fractured |
| 1996-12-31 | Perforation Treatment Performed - Fractured |
| 1997-01-05 | Perforation Treatment Performed - Jet Perforation |
| 1997-01-08 | Perforation Treatment Performed - Fractured |
| 1997-02-16 | Well Began Production |
| 1997-02-16 | Well Fluid changed to Gas |
| 1997-02-16 | Well Mode changed to Flowing |
| 2002-06-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2002-06-06 | Plug Back Performed |
| 2002-06-06 | Well Abandoned |
| 2002-06-06 | Well Fluid changed to Gas |
| 2002-06-06 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1996-12-16 | Perforation | 314.50 | 318.20 | 13 |
| 2002-06-06 | Packing Device Capped w/Cement | 232.00 | 240.00 | 0 |
| 1996-12-23 | Perforation | 314.50 | 318.20 | 13 |
| 1996-12-29 | Fracture | 314.50 | 318.20 | 0 |
| 1996-12-31 | Fracture | 314.50 | 318.20 | 0 |
| 1997-01-05 | Perforation | 253.00 | 256.50 | 13 |
| 1997-01-05 | Perforation | 249.00 | 251.80 | 13 |
| 1997-01-08 | Fracture | 249.00 | 256.50 | 0 |
| 2002-06-06 | Packing Device Capped w/Cement | 312.00 | 320.00 | 0 |
| 2002-06-06 | Packing Device Capped w/Cement | 304.00 | 312.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1997 | 7166 | 0.0 | 0.0 | 0.0 |
| 1998 | 8369 | 0.0 | 0.0 | 0.0 |
| 1999 | 7846 | 0.0 | 0.0 | 0.0 |
| 2000 | 8229 | 0.0 | 0.0 | 0.0 |
| 2001 | 8313 | 0.0 | 0.0 | 0.0 |
| 2002 | 4050 | 0.0 | 0.0 | 0.0 |
For data sources see[5]