If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414201916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.547914,"lon":-112.864401,"icon":""}]} |
Location: 00/16-19-041-20W4/0 | |
Location Alias: 00/16-19-41-20 W4M | |
Location Alias 2: 00/16-19-041-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 20 | |
Section: 19 | |
County/Municipality: Camrose County | |
Well Name: TEAC BASHAW 16-19-41-20 | |
Operator Name: Trident Exploration (Alberta) Corp. | |
License Number: 0193846 | |
License Date: 1996-11-21 | |
License Status: Abandoned | |
Spud Date: 1996-12-01 | |
Final Drill Date: 1996-12-03 | |
Well Total Depth: 624.00 m | |
Surface Hole Latitude: 52.547914 | |
Surface Hole Longitude: -112.864401 |
Date | Event |
---|---|
1996-11-21 | Obtained License |
1996-12-01 | Surface Casing Operation Performed |
1996-12-03 | Finished Drilling |
1996-12-03 | Well Log Performed |
1996-12-03 | Well Mode changed to Drilled and Cased |
1996-12-04 | Production Casing Operation Performed |
1996-12-04 | Rig Released |
1996-12-16 | Perforation Treatment Performed - Jet Perforation |
1996-12-23 | Perforation Treatment Performed - Jet Perforation |
1996-12-29 | Perforation Treatment Performed - Fractured |
1996-12-31 | Perforation Treatment Performed - Fractured |
1997-01-05 | Perforation Treatment Performed - Jet Perforation |
1997-01-08 | Perforation Treatment Performed - Fractured |
1997-02-16 | Well Began Production |
1997-02-16 | Well Fluid changed to Gas |
1997-02-16 | Well Mode changed to Flowing |
2002-06-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-06-06 | Plug Back Performed |
2002-06-06 | Well Abandoned |
2002-06-06 | Well Fluid changed to Gas |
2002-06-06 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-12-16 | Perforation | 314.50 | 318.20 | 13 |
2002-06-06 | Packing Device Capped w/Cement | 232.00 | 240.00 | 0 |
1996-12-23 | Perforation | 314.50 | 318.20 | 13 |
1996-12-29 | Fracture | 314.50 | 318.20 | 0 |
1996-12-31 | Fracture | 314.50 | 318.20 | 0 |
1997-01-05 | Perforation | 253.00 | 256.50 | 13 |
1997-01-05 | Perforation | 249.00 | 251.80 | 13 |
1997-01-08 | Fracture | 249.00 | 256.50 | 0 |
2002-06-06 | Packing Device Capped w/Cement | 312.00 | 320.00 | 0 |
2002-06-06 | Packing Device Capped w/Cement | 304.00 | 312.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 7166 | 0.0 | 0.0 | 0.0 |
1998 | 8369 | 0.0 | 0.0 | 0.0 |
1999 | 7846 | 0.0 | 0.0 | 0.0 |
2000 | 8229 | 0.0 | 0.0 | 0.0 |
2001 | 8313 | 0.0 | 0.0 | 0.0 |
2002 | 4050 | 0.0 | 0.0 | 0.0 |
For data sources see[5]