If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414202915000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.562462,"lon":-112.841888,"icon":""}]} |
Location: 00/15-29-041-20W4/0 | |
Location Alias: 00/15-29-41-20 W4M | |
Location Alias 2: 00/15-29-041-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 20 | |
Section: 29 | |
County/Municipality: Camrose County | |
Well Name: EMBER BASHAW 15-29-41-20 | |
Operator Name: Ember Resources Inc. | |
License Number: 0288905 | |
License Date: 2003-06-24 | |
License Status: Issued | |
Spud Date: 2003-07-04 | |
Final Drill Date: 2003-07-20 | |
Well Total Depth: 655.00 m | |
Surface Hole Latitude: 52.562462 | |
Surface Hole Longitude: -112.841888 |
Date | Event |
---|---|
2003-06-24 | Obtained License |
2003-07-04 | Surface Casing Operation Performed |
2003-07-20 | Finished Drilling |
2003-07-20 | Production Casing Operation Performed |
2003-07-20 | Rig Released |
2003-07-20 | Well Log Performed |
2003-07-20 | Well Mode changed to Drilled and Cased |
2003-07-29 | Perforation Treatment Performed - Jet Perforation |
2003-07-29 | Well Log Performed |
2003-08-01 | Perforation Treatment Performed - Fractured |
2003-09-08 | Well Began Production |
2003-09-08 | Well Fluid changed to Gas |
2003-09-08 | Well Mode changed to Flowing |
2005-05-08 | Well Log Performed |
2005-05-10 | Perforation Treatment Performed - Cement Squeeze |
2005-05-10 | Plug Back Performed |
2005-11-13 | Perforation Treatment Performed - Jet Perforation |
2005-11-17 | Perforation Treatment Performed - Fractured |
2009-05-27 | Perforation Treatment Performed - Jet Perforation |
2009-05-27 | Well Log Performed |
2009-05-28 | Perforation Treatment Performed - Fractured |
2009-05-29 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-05-29 | Well Mode changed to Flowing |
2009-07-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-07-16 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-07-29 | Perforation | 239.00 | 241.00 | 17 |
2005-11-13 | Perforation | 179.50 | 180.50 | 13 |
2005-11-13 | Perforation | 186.00 | 187.00 | 13 |
2005-11-13 | Perforation | 194.00 | 195.00 | 13 |
2005-11-13 | Perforation | 200.50 | 201.50 | 13 |
2005-11-13 | Perforation | 203.50 | 204.50 | 13 |
2005-11-13 | Perforation | 210.00 | 211.00 | 13 |
2005-11-13 | Perforation | 220.00 | 223.00 | 13 |
2005-11-13 | Perforation | 225.00 | 227.00 | 13 |
2005-11-13 | Perforation | 228.50 | 229.50 | 13 |
2005-11-17 | Fracture | 165.00 | 229.50 | 0 |
2003-07-29 | Perforation | 313.50 | 315.00 | 17 |
2009-05-27 | Perforation | 551.00 | 552.00 | 14 |
2009-05-27 | Perforation | 580.00 | 581.00 | 14 |
2009-05-27 | Perforation | 594.00 | 595.00 | 14 |
2009-05-27 | Perforation | 601.00 | 602.00 | 14 |
2009-05-28 | Fracture | 551.00 | 602.00 | 0 |
2003-07-29 | Perforation | 339.70 | 340.30 | 17 |
2003-07-29 | Perforation | 345.00 | 346.00 | 17 |
2003-07-29 | Perforation | 348.00 | 349.50 | 17 |
2003-07-29 | Perforation | 376.00 | 377.00 | 17 |
2003-08-01 | Fracture | 239.00 | 377.00 | 0 |
2005-05-10 | Cement Squeeze | 239.00 | 241.00 | 0 |
2005-11-13 | Perforation | 165.00 | 166.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 2731 | 0.0 | 0.0 | 0.0 |
2004 | 8681 | 0.0 | 0.0 | 0.0 |
2005 | 7247 | 0.0 | 0.0 | 0.0 |
2006 | 8651 | 0.0 | 0.0 | 0.0 |
2007 | 8294 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8667 | 0.0 | 0.0 | 0.0 |
2010 | 8753 | 0.0 | 0.0 | 0.0 |
2011 | 8736 | 0.0 | 0.0 | 0.0 |
2012 | 8702 | 0.0 | 0.0 | 0.0 |
2013 | 8748 | 0.0 | 0.0 | 0.0 |
2014 | 8658 | 0.0 | 0.0 | 0.0 |
2015 | 8740 | 0.0 | 0.0 | 0.0 |
2016 | 8581 | 0.0 | 0.0 | 0.0 |
2017 | 8057 | 0.0 | 0.0 | 0.0 |
2018 | 8101 | 0.0 | 0.0 | 0.0 |
2019 | 8420 | 0.0 | 0.0 | 0.0 |
2020 | 2040 | 0.0 | 0.0 | 0.0 |
For data sources see[5]