If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414213005002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/05-30-041-21W4/2 | |
Location Alias: 00/05-30-41-21 W4M | |
Location Alias 2: 00/05-30-041-21 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 21 | |
Section: 30 | |
County/Municipality: Camrose County | |
Well Name: DEKALB ET AL REGNIER 5-30-41-21 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0092635 | |
License Date: 1981-10-07 | |
License Status: RecCertified | |
Spud Date: 1981-10-24 | |
Final Drill Date: 1981-10-26 | |
Well Total Depth: 715.00 m | |
Surface Hole Latitude: 52.555715 | |
Surface Hole Longitude: -113.022511 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-10-07 | Obtained License |
1981-10-26 | Finished Drilling |
1981-10-26 | Production Casing Operation Performed |
1981-10-26 | Well Mode changed to Drilled and Cased |
1981-11-12 | Perforation Treatment Performed - Jet Perforation |
1985-05-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-05-10 | Perforation Treatment Performed - Jet Perforation |
1985-05-10 | Plug Back Performed |
1985-05-10 | Well Log Performed |
1985-05-15 | Perforation Treatment Performed - Jet Perforation |
1985-05-16 | Perforation Treatment Performed - Fractured |
1985-05-17 | Well Log Performed |
1985-05-30 | Perforation Treatment Performed - Jet Perforation |
1985-07-01 | Well Began Production |
1985-07-01 | Well Fluid changed to Gas |
1985-07-01 | Well Mode changed to Flowing |
1989-07-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-07-14 | Plug Back Performed |
1989-07-14 | Well Abandoned |
1989-07-14 | Well Fluid changed to Gas |
1989-07-14 | Well Log Performed |
1989-07-14 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-11-12 | Perforation | 638.00 | 641.00 | 7 |
1985-05-30 | Perforation | 485.00 | 486.00 | 6 |
1985-05-30 | Perforation | 482.50 | 484.00 | 6 |
1985-05-30 | Perforation | 478.50 | 479.50 | 6 |
1985-05-30 | Perforation | 445.50 | 447.00 | 6 |
1985-05-30 | Perforation | 442.00 | 443.00 | 6 |
1989-07-14 | Packing Device Capped w/Cement | 337.00 | 345.00 | 0 |
1985-05-10 | Packing Device Capped w/Cement | 612.00 | 620.00 | 0 |
1985-05-10 | Perforation | 410.00 | 411.00 | 6 |
1985-05-10 | Perforation | 395.50 | 397.00 | 6 |
1985-05-10 | Perforation | 364.00 | 365.00 | 6 |
1985-05-15 | Perforation | 410.00 | 411.00 | 6 |
1985-05-15 | Perforation | 395.50 | 397.00 | 6 |
1985-05-15 | Perforation | 364.00 | 365.00 | 6 |
1985-05-16 | Fracture | 364.00 | 411.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 1343 | 0.0 | 0.0 | 0.0 |
1986 | 3021 | 0.0 | 0.0 | 0.0 |
1987 | 15 | 0.0 | 0.0 | 0.0 |
1988 | 1755 | 0.0 | 0.0 | 0.0 |
For data sources see[5]