If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414213411000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.575758,"lon":-112.946468,"icon":""}]} |
Location: 00/11-34-041-21W4/0 | |
Location Alias: 00/11-34-41-21 W4M | |
Location Alias 2: 00/11-34-041-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 21 | |
Section: 34 | |
County/Municipality: Camrose County | |
Well Name: EMBER BASHAW 11-34-41-21 | |
Operator Name: Ember Resources Inc. | |
License Number: 0332198 | |
License Date: 2005-06-02 | |
License Status: Issued | |
Spud Date: 2005-07-20 | |
Final Drill Date: 2005-07-23 | |
Well Total Depth: 914.00 m | |
Surface Hole Latitude: 52.575758 | |
Surface Hole Longitude: -112.946468 |
Date | Event |
---|---|
2005-06-02 | Obtained License |
2005-07-20 | Surface Casing Operation Performed |
2005-07-23 | Finished Drilling |
2005-07-23 | Production Casing Operation Performed |
2005-07-23 | Rig Released |
2005-07-23 | Well Mode changed to Drilled and Cased |
2005-08-06 | Well Log Performed |
2005-08-10 | Perforation Treatment Performed - Jet Perforation |
2005-08-12 | Perforation Treatment Performed - Fractured |
2005-08-12 | Perforation Treatment Performed - Jet Perforation |
2005-08-13 | Perforation Treatment Performed - Fractured |
2005-12-11 | Well Began Production |
2005-12-11 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-12-11 | Well Mode changed to Flowing |
2005-12-12 | Well Log Performed |
2007-11-06 | Well Log Performed |
2008-10-16 | Perforation Treatment Performed - Jet Perforation |
2008-10-21 | Perforation Treatment Performed - Fractured |
2008-11-21 | Well Log Performed |
2009-07-20 | Well Log Performed |
2010-08-09 | Well Log Performed |
2011-09-21 | Well Log Performed |
2012-10-09 | Well Log Performed |
2013-09-12 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-08-10 | Perforation | 301.50 | 302.00 | 14 |
2005-08-10 | Perforation | 212.30 | 213.00 | 7 |
2005-08-12 | Perforation | 196.50 | 197.00 | 14 |
2005-08-12 | Fracture | 301.50 | 302.00 | 0 |
2005-08-12 | Fracture | 288.00 | 288.50 | 0 |
2005-08-12 | Fracture | 268.00 | 269.50 | 0 |
2005-08-12 | Fracture | 263.50 | 266.50 | 0 |
2005-08-12 | Fracture | 246.50 | 247.50 | 0 |
2005-08-12 | Fracture | 238.50 | 240.50 | 0 |
2005-08-12 | Fracture | 232.30 | 233.30 | 0 |
2005-08-12 | Fracture | 228.50 | 230.00 | 0 |
2005-08-10 | Perforation | 288.00 | 288.50 | 14 |
2005-08-12 | Fracture | 224.00 | 224.50 | 0 |
2005-08-12 | Fracture | 212.30 | 213.00 | 0 |
2005-08-13 | Fracture | 196.50 | 197.00 | 0 |
2008-10-16 | Perforation | 452.00 | 453.00 | 17 |
2008-10-16 | Perforation | 405.00 | 406.00 | 17 |
2008-10-16 | Perforation | 402.00 | 404.00 | 17 |
2008-10-16 | Perforation | 388.00 | 391.00 | 17 |
2008-10-21 | Fracture | 388.00 | 453.00 | 0 |
2005-08-10 | Perforation | 268.00 | 269.50 | 7 |
2005-08-10 | Perforation | 263.50 | 266.50 | 7 |
2005-08-10 | Perforation | 246.50 | 247.50 | 7 |
2005-08-10 | Perforation | 238.50 | 240.50 | 7 |
2005-08-10 | Perforation | 232.30 | 233.30 | 7 |
2005-08-10 | Perforation | 228.50 | 230.00 | 7 |
2005-08-10 | Perforation | 224.00 | 224.50 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 404 | 0.0 | 0.0 | 0.0 |
2006 | 8627 | 0.0 | 0.0 | 0.0 |
2007 | 8729 | 0.0 | 0.0 | 0.0 |
2008 | 6885 | 0.0 | 0.0 | 0.0 |
2009 | 8361 | 0.0 | 0.0 | 0.0 |
2010 | 8495 | 0.0 | 0.0 | 0.0 |
2011 | 8134 | 0.0 | 0.0 | 0.0 |
2012 | 7630 | 0.0 | 0.0 | 0.0 |
2013 | 8240 | 0.0 | 0.0 | 0.0 |
2014 | 8709 | 0.0 | 0.0 | 0.0 |
2015 | 8696 | 0.0 | 0.0 | 0.0 |
2016 | 8776 | 0.0 | 0.0 | 0.0 |
2017 | 8749 | 0.0 | 0.0 | 0.0 |
2018 | 8587 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
2020 | 1905 | 0.0 | 0.0 | 0.0 |
For data sources see[5]