X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414243006000

Well Details

Well ID: 0414243006000
Loading map...
Location: 00/06-30-041-24W4/0
Location Alias: 00/06-30-41-24 W4M
Location Alias 2: 00/06-30-041-24 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 24
Section: 30
County/Municipality: Lacombe County
Well Name: GLENCOE CHIGWELL 6-30-41-24
Operator Name: AlphaBow Energy Ltd.
License Number: 0100515
License Date: 1983-02-09
License Status: Issued
Spud Date: 1983-02-24
Final Drill Date: 1983-03-05
Well Total Depth: 1646.00 m
Surface Hole Latitude: 52.555713
Surface Hole Longitude: -113.452292

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-02-09 Obtained License
1983-03-05 Finished Drilling
1983-03-05 Well Log Performed
1983-03-05 Well Mode changed to Drilled and Cased
1983-03-07 Drill Stem Test Performed
1983-03-09 Production Casing Operation Performed
1983-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-24 Perforation Treatment Performed - Jet Perforation
1983-04-01 Well Began Production
1983-04-01 Well Fluid changed to Crude Oil
1983-04-01 Well Mode changed to Pumping
1986-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-08 Perforation Treatment Performed - Chemical Squeeze
1990-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-15 Perforation Treatment Performed - Chemical Squeeze
1992-02-06 Perforation Treatment Performed - Fractured
1992-02-06 Perforation Treatment Performed - Jet Perforation
2019-03-01 Well Fluid changed to Crude Oil
2019-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-03-24 Perforation 1539.00 1541.40 7
1983-03-24 Acid Treatment 1539.00 1541.40 0
1986-05-30 Acid Treatment 1539.00 1541.40 0
1987-12-08 Chemical Squeeze 1539.00 1541.40 0
1990-05-25 Acid Treatment 1539.00 1541.40 0
1990-08-15 Chemical Squeeze 1539.00 1541.40 0
1992-02-06 Perforation 1539.00 1541.40 13
1992-02-06 Fracture 1539.00 1541.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 5924 0.0 0.0 0.0
1984 8642 0.0 0.0 0.0
1985 8080 0.0 0.0 0.0
1986 5699 0.0 0.0 0.0
1987 8419 0.0 0.0 0.0
1988 6202 0.0 0.0 0.0
1990 4146 0.0 0.0 0.0
1991 8325 0.0 0.0 0.0
1992 2567 0.0 0.0 0.0
1993 5676 0.0 0.0 0.0
1994 7886 0.0 0.0 0.0
1995 8247 0.0 0.0 0.0
1996 8488 0.0 0.0 0.0
1997 7095 0.0 0.0 0.0
1998 4810 0.0 0.0 0.0
1999 6591 0.0 0.0 0.0
2000 8437 0.0 0.0 0.0
2001 8702 0.0 0.0 0.0
2002 8541 0.0 0.0 0.0
2003 8517 0.0 0.0 0.0
2004 8604 0.0 0.0 0.0
2005 8698 0.0 0.0 0.0
2006 8577 0.0 0.0 0.0
2007 8111 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8423 0.0 0.0 0.0
2011 8639 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8485 0.0 0.0 0.0
2014 8621 0.0 0.0 0.0
2015 8637 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 5056 0.0 0.0 0.0

For data sources see[5]

References