If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414250809002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.516123,"lon":-113.560703,"icon":""}]} |
Location: 00/09-08-041-25W4/2 | |
Location Alias: 00/09-08-41-25 W4M | |
Location Alias 2: 00/09-08-041-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 25 | |
Section: 08 | |
County/Municipality: Lacombe County | |
Well Name: OEI CHIGWELL 9-8-41-25 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0078969 | |
License Date: 1979-10-31 | |
License Status: Suspension | |
Spud Date: 1979-11-18 | |
Final Drill Date: 1979-12-01 | |
Well Total Depth: 1640.00 m | |
Surface Hole Latitude: 52.516123 | |
Surface Hole Longitude: -113.560703 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-10-31 | Obtained License |
1979-12-01 | Finished Drilling |
1979-12-01 | Well Mode changed to Drilled and Cased |
1979-12-04 | Production Casing Operation Performed |
1979-12-07 | Perforation Treatment Performed - Jet Perforation |
1979-12-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-12-11 | Perforation Treatment Performed - Fractured |
1979-12-14 | Perforation Treatment Performed - Jet Perforation |
1979-12-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-02-17 | Well Began Production |
1980-02-17 | Well Fluid changed to Crude Oil |
1980-02-17 | Well Mode changed to Pumping |
1981-02-01 | Well Structure changed to Commingled |
1994-10-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-14 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-12-07 | Perforation | 1614.50 | 1617.20 | 12 |
1979-12-08 | Acid Treatment | 1614.50 | 1617.20 | 0 |
1979-12-11 | Fracture | 1614.50 | 1617.20 | 0 |
1979-12-14 | Perforation | 1620.00 | 1624.50 | 12 |
1979-12-16 | Acid Treatment | 1620.00 | 1624.50 | 0 |
1994-10-14 | Packing Device Capped w/Cement | 1591.50 | 1599.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 1258 | 0.0 | 0.0 | 0.0 |
1981 | 288 | 0.0 | 0.0 | 0.0 |
For data sources see[5]