X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414251406002

Well Details

Well ID: 0414251406002
Loading map...
Location: 00/06-14-041-25W4/2
Location Alias: 00/06-14-41-25 W4M
Location Alias 2: 00/06-14-041-25 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 25
Section: 14
County/Municipality: Lacombe County
Well Name: OEI CHIGWELL 6-14-41-25
Operator Name: AlphaBow Energy Ltd.
License Number: 0063735
License Date: 1977-05-06
License Status: Issued
Spud Date: 1977-06-09
Final Drill Date: 1977-06-21
Well Total Depth: 1667.30 m
Surface Hole Latitude: 52.525509
Surface Hole Longitude: -113.499988

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-05-06 Obtained License
1977-06-15 Drill Stem Test Performed
1977-06-19 Drill Stem Test Performed
1977-06-21 Finished Drilling
1977-06-21 Well Mode changed to Drilled and Cased
1977-06-22 Drill Stem Test Performed
1977-06-23 Drill Stem Test Performed
1977-06-24 Production Casing Operation Performed
1977-08-18 Perforation Treatment Performed - Jet Perforation
1977-08-19 Perforation Treatment Performed - Fractured
1984-02-25 Well Log Performed
1984-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-02-26 Perforation Treatment Performed - Jet Perforation
1984-02-26 Plug Back Performed
1984-03-05 Well Began Production
1984-03-05 Well Fluid changed to Crude Oil
1984-03-05 Well Mode changed to Pumping
1990-02-27 Well Log Performed
1990-02-28 Perforation Treatment Performed - Jet Perforation
1990-03-01 Perforation Treatment Performed - Fractured
2002-08-31 Well Fluid changed to Crude Oil
2002-08-31 Well Mode changed to Suspended
2007-12-24 Well Fluid changed to Crude Oil
2007-12-24 Well Mode changed to Pumping
2018-12-01 Well Fluid changed to Crude Oil
2018-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-08-18 Perforation 1562.70 1564.50 3
1977-08-19 Fracture 1562.70 1564.50 0
1984-02-26 Packing Device Capped w/Cement 1549.00 1557.00 0
1984-02-26 Perforation 1400.90 1402.10 10
1990-02-28 Perforation 1399.50 1402.50 13
1990-03-01 Fracture 1399.00 1402.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 4916 0.0 0.0 0.0
1985 3666 0.0 0.0 0.0
1986 1476 0.0 0.0 0.0
1987 4556 0.0 0.0 0.0
1988 5162 0.0 0.0 0.0
1989 2610 0.0 0.0 0.0
1990 4454 0.0 0.0 0.0
1991 1494 0.0 0.0 0.0
1992 4288 0.0 0.0 0.0
1993 2462 0.0 0.0 0.0
1994 3480 0.0 0.0 0.0
1995 4090 0.0 0.0 0.0
1996 5995 0.0 0.0 0.0
1997 3530 0.0 0.0 0.0
1998 96 0.0 0.0 0.0
2007 192 0.0 0.0 0.0
2008 4206 0.0 0.0 0.0
2010 3739 0.0 0.0 0.0
2011 7118 0.0 0.0 0.0
2012 8718 0.0 0.0 0.0
2013 8454 0.0 0.0 0.0
2014 7635 0.0 0.0 0.0
2015 1 0.0 0.0 0.0
2016 24 0.0 0.0 0.0
2017 3 0.0 0.0 0.0

For data sources see[5]

References