X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414251511022

Well Details

Well ID: 0414251511022
Loading map...
Location: 02/11-15-041-25W4/2
Location Alias: 02/11-15-41-25 W4M
Location Alias 2: 02/11-15-041-25 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 25
Section: 15
County/Municipality: Lacombe County
Well Name: GLENCOE 102 CHIGWELL 11-15-41-25
Operator Name: AlphaBow Energy Ltd.
License Number: 0243659
License Date: 2000-10-27
License Status: Issued
Spud Date: 2000-12-10
Final Drill Date: 2000-12-16
Well Total Depth: 1646.00 m
Surface Hole Latitude: 52.529541
Surface Hole Longitude: -113.520926

For data sources see[1][2]

Well History

Date Event
2000-10-27 Obtained License
2000-12-11 Surface Casing Operation Performed
2000-12-16 Finished Drilling
2000-12-16 Well Log Performed
2000-12-16 Well Mode changed to Drilled and Cased
2000-12-17 Drill Stem Test Performed
2000-12-17 Production Casing Operation Performed
2000-12-18 Rig Released
2001-01-04 Well Log Performed
2001-01-05 Perforation Treatment Performed - Jet Perforation
2001-01-05 Well Log Performed
2001-01-10 Perforation Treatment Performed - Jet Perforation
2001-01-10 Well Log Performed
2001-01-10 Well Mode changed to Drilled and Cased
2001-01-19 Well Log Performed
2001-01-20 Well Log Performed
2001-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-22 Perforation Treatment Performed - Cement Squeeze
2001-01-22 Plug Back Performed
2001-01-24 Perforation Treatment Performed - Jet Perforation
2001-01-24 Well Log Performed
2001-01-25 Perforation Treatment Performed - Cement Squeeze
2001-01-25 Plug Back Performed
2001-01-29 Well Log Performed
2001-01-30 Perforation Treatment Performed - Jet Perforation
2001-01-30 Well Log Performed
2001-02-01 Perforation Treatment Performed - Fractured
2001-03-24 Well Began Production
2001-03-24 Well Fluid changed to Crude Oil
2001-03-24 Well Mode changed to Pumping
2007-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-08-18 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-05 Perforation 1602.30 1603.80 13
2001-01-25 Cement Squeeze 1578.50 1579.00 0
2001-01-30 Perforation 1579.00 1581.00 13
2001-02-01 Fracture 1579.00 1581.00 0
2007-09-04 Acid Treatment 1579.00 1581.00 0
2013-08-18 Chemical Squeeze 1579.00 1581.00 0
2001-01-05 Perforation 1605.80 1607.30 13
2001-01-10 Perforation 1579.00 1581.00 13
2001-01-22 Cement Squeeze 1602.80 1607.30 0
2001-01-22 Cement Squeeze 1579.00 1581.00 0
2001-01-22 Packing Device Capped w/Cement 1597.00 1599.00 0
2001-01-24 Perforation 1480.00 1480.50 4
2001-01-24 Perforation 1578.50 1579.00 4
2001-01-25 Cement Squeeze 1480.00 1480.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 5114 0.0 0.0 0.0
2002 8704 0.0 0.0 0.0
2003 8640 0.0 0.0 0.0
2004 8084 0.0 0.0 0.0
2005 7553 0.0 0.0 0.0
2006 7685 0.0 0.0 0.0
2007 4792 0.0 0.0 0.0
2008 8411 0.0 0.0 0.0
2009 8483 0.0 0.0 0.0
2010 8671 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8689 0.0 0.0 0.0
2013 8533 0.0 0.0 0.0
2014 8747 0.0 0.0 0.0
2015 8696 0.0 0.0 0.0
2016 8706 0.0 0.0 0.0
2017 7309 0.0 0.0 0.0
2018 768 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References