If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414252416020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.54947,"lon":-113.460958,"icon":""}]} |
Location: 02/16-24-041-25W4/0 | |
Location Alias: 02/16-24-41-25 W4M | |
Location Alias 2: 02/16-24-041-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 25 | |
Section: 24 | |
County/Municipality: Lacombe County | |
Well Name: GLENCOE CHIGWELL 16-24-41-25 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0098131 | |
License Date: 1982-10-20 | |
License Status: Issued | |
Spud Date: 1982-10-23 | |
Final Drill Date: 1982-11-03 | |
Well Total Depth: 1969.00 m | |
Surface Hole Latitude: 52.549470 | |
Surface Hole Longitude: -113.460958 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-10-20 | Obtained License |
1982-11-03 | Finished Drilling |
1982-11-03 | Well Mode changed to Drilled and Cased |
1982-11-04 | Well Log Performed |
1982-11-05 | Drill Stem Test Performed |
1982-11-06 | Kick Occurred |
1982-11-07 | Drill Stem Test Performed |
1982-11-08 | Drill Stem Test Performed |
1982-11-09 | Drill Stem Test Performed |
1982-11-10 | Production Casing Operation Performed |
1982-12-08 | Perforation Treatment Performed - Jet Perforation |
1982-12-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-12-10 | Well Began Production |
1982-12-10 | Well Fluid changed to Crude Oil |
1982-12-10 | Well Mode changed to Flowing |
1983-06-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-09-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-09-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-09-19 | Perforation Treatment Performed - Jet Perforation |
1983-09-19 | Well Fluid changed to Crude Oil |
1983-09-19 | Well Mode changed to Abandoned Zone |
1983-09-20 | Perforation Treatment Performed - Fractured |
1986-10-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-10-08 | Perforation Treatment Performed - Jet Perforation |
1986-10-08 | Plug Back Performed |
1986-10-09 | Perforation Treatment Performed - Remedial Casing |
1993-07-25 | Perforation Treatment Performed - Jet Perforation |
1993-08-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-12-08 | Perforation | 1925.00 | 1926.00 | 13 |
1986-10-09 | Remedial Casing Cementing | 956.00 | 957.00 | 0 |
1993-07-25 | Perforation | 1542.80 | 1543.90 | 13 |
1993-08-03 | Acid Treatment | 1542.80 | 1543.90 | 0 |
1982-12-09 | Acid Treatment | 1925.00 | 1926.00 | 0 |
1983-06-25 | Acid Treatment | 1925.00 | 1926.00 | 0 |
1983-09-16 | Packing Device Capped w/Cement | 1902.00 | 1910.00 | 0 |
1983-09-19 | Perforation | 1542.80 | 1543.90 | 13 |
1983-09-19 | Acid Treatment | 1542.80 | 1543.90 | 0 |
1983-09-20 | Fracture | 1542.80 | 1543.90 | 0 |
1986-10-08 | Packing Device Capped w/Cement | 1500.00 | 1500.00 | 0 |
1986-10-08 | Perforation | 956.00 | 957.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 168 | 0.0 | 0.0 | 0.0 |
1983 | 4948 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1982-11-06 | Kick | 1969.00 | 1969.00 |
For data sources see[6]