X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414252416020

Well Details

Well ID: 0414252416020
Loading map...
Location: 02/16-24-041-25W4/0
Location Alias: 02/16-24-41-25 W4M
Location Alias 2: 02/16-24-041-25 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 25
Section: 24
County/Municipality: Lacombe County
Well Name: GLENCOE CHIGWELL 16-24-41-25
Operator Name: AlphaBow Energy Ltd.
License Number: 0098131
License Date: 1982-10-20
License Status: Issued
Spud Date: 1982-10-23
Final Drill Date: 1982-11-03
Well Total Depth: 1969.00 m
Surface Hole Latitude: 52.549470
Surface Hole Longitude: -113.460958

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-10-20 Obtained License
1982-11-03 Finished Drilling
1982-11-03 Well Mode changed to Drilled and Cased
1982-11-04 Well Log Performed
1982-11-05 Drill Stem Test Performed
1982-11-06 Kick Occurred
1982-11-07 Drill Stem Test Performed
1982-11-08 Drill Stem Test Performed
1982-11-09 Drill Stem Test Performed
1982-11-10 Production Casing Operation Performed
1982-12-08 Perforation Treatment Performed - Jet Perforation
1982-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-10 Well Began Production
1982-12-10 Well Fluid changed to Crude Oil
1982-12-10 Well Mode changed to Flowing
1983-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-19 Perforation Treatment Performed - Jet Perforation
1983-09-19 Well Fluid changed to Crude Oil
1983-09-19 Well Mode changed to Abandoned Zone
1983-09-20 Perforation Treatment Performed - Fractured
1986-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-10-08 Perforation Treatment Performed - Jet Perforation
1986-10-08 Plug Back Performed
1986-10-09 Perforation Treatment Performed - Remedial Casing
1993-07-25 Perforation Treatment Performed - Jet Perforation
1993-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-12-08 Perforation 1925.00 1926.00 13
1986-10-09 Remedial Casing Cementing 956.00 957.00 0
1993-07-25 Perforation 1542.80 1543.90 13
1993-08-03 Acid Treatment 1542.80 1543.90 0
1982-12-09 Acid Treatment 1925.00 1926.00 0
1983-06-25 Acid Treatment 1925.00 1926.00 0
1983-09-16 Packing Device Capped w/Cement 1902.00 1910.00 0
1983-09-19 Perforation 1542.80 1543.90 13
1983-09-19 Acid Treatment 1542.80 1543.90 0
1983-09-20 Fracture 1542.80 1543.90 0
1986-10-08 Packing Device Capped w/Cement 1500.00 1500.00 0
1986-10-08 Perforation 956.00 957.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 168 0.0 0.0 0.0
1983 4948 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-11-06 Kick 1969.00 1969.00

For data sources see[6]

References