X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414252704000

Well Details

Well ID: 0414252704000
Loading map...
Location: 00/04-27-041-25W4/0
Location Alias: 00/04-27-41-25 W4M
Location Alias 2: 00/04-27-041-25 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 25
Section: 27
County/Municipality: Lacombe County
Well Name: OEI CHIGWELL 4-27-41-25
Operator Name: AlphaBow Energy Ltd.
License Number: 0064088
License Date: 1977-06-01
License Status: Issued
Spud Date: 1977-06-01
Final Drill Date: 1977-06-12
Well Total Depth: 1722.10 m
Surface Hole Latitude: 52.553113
Surface Hole Longitude: -113.526806

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-06-01 Obtained License
1977-06-12 Finished Drilling
1977-06-13 Drill Stem Test Performed
1977-06-14 Production Casing Operation Performed
1977-06-14 Well Mode changed to Drilled and Cased
1977-06-20 Perforation Treatment Performed - Jet Perforation
1977-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-06-22 Perforation Treatment Performed - Fractured
1977-07-05 Perforation Treatment Performed - Jet Perforation
1977-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-06 Well Began Production
1977-12-06 Well Fluid changed to Crude Oil
1977-12-06 Well Mode changed to Pumping
1982-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-02-15 Well Fluid changed to Crude Oil
1982-02-15 Well Mode changed to Suspended
1995-05-08 Perforation Treatment Performed - Jet Perforation
1995-05-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-06-20 Perforation 1607.80 1610.00 10
1977-06-21 Acid Treatment 1607.80 1610.00 0
1977-06-22 Fracture 1607.80 1610.00 0
1977-07-05 Perforation 1447.80 1450.80 10
1977-07-06 Acid Treatment 1447.80 1450.80 0
1982-02-06 Packing Device Capped w/Cement 1570.00 1600.00 0
1995-05-08 Perforation 1447.80 1450.80 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 510 0.0 0.0 0.0
1978 7041 0.0 0.0 0.0
1979 7389 0.0 0.0 0.0
1980 2633 0.0 0.0 0.0
1981 698 0.0 0.0 0.0

For data sources see[5]

References