X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414253612000

Well Details

Well ID: 0414253612000
Loading map...
Location: 00/12-36-041-25W4/0
Location Alias: 00/12-36-41-25 W4M
Location Alias 2: 00/12-36-041-25 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 25
Section: 36
County/Municipality: Lacombe County
Well Name: OEI CHIGWELL 12-36-41-25
Operator Name: AlphaBow Energy Ltd.
License Number: 0071621
License Date: 1978-08-25
License Status: Suspension
Spud Date: 1978-08-30
Final Drill Date: 1978-09-04
Well Total Depth: 1664.00 m
Surface Hole Latitude: 52.574853
Surface Hole Longitude: -113.478897

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-08-25 Obtained License
1978-09-04 Finished Drilling
1978-09-06 Production Casing Operation Performed
1978-09-26 Well Mode changed to Drilled and Cased
1983-07-30 Perforation Treatment Performed - Jet Perforation
1983-07-30 Well Log Performed
1983-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-08-02 Perforation Treatment Performed - Jet Perforation
1983-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-01 Well Log Performed
1985-11-24 Well Began Production
1985-11-24 Well Fluid changed to Crude Oil
1985-11-24 Well Mode changed to Flowing
1998-01-01 Well Fluid changed to Crude Oil
1998-01-01 Well Mode changed to Suspended
2006-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-05-15 Perforation Treatment Performed - Cement Squeeze
2006-05-15 Plug Back Performed
2006-05-15 Well Fluid changed to Crude Oil
2006-05-15 Well Mode changed to Abandoned Zone
2006-05-21 Perforation Treatment Performed - Jet Perforation
2006-05-23 Perforation Treatment Performed - Fractured
2018-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-14 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-07-30 Perforation 1584.00 1585.00 7
2006-05-23 Fracture 1585.50 1588.50 0
2018-03-14 Packing Device Capped w/Cement 1565.00 1573.00 0
2018-03-14 Packing Device Capped w/Cement 1542.00 1550.00 0
1983-07-30 Perforation 1585.50 1588.50 7
1983-07-31 Acid Treatment 1584.00 1588.50 0
1983-08-01 Packing Device Capped w/Cement 1572.00 1580.00 0
1983-08-02 Perforation 1559.20 1561.50 7
1983-08-03 Acid Treatment 1559.20 1561.50 0
2006-05-14 Acid Treatment 1559.20 1561.50 0
2006-05-15 Cement Squeeze 1559.20 1561.50 0
2006-05-21 Perforation 1585.50 1588.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 7 0.0 0.0 0.0
1986 5581 0.0 0.0 0.0
1987 4722 0.0 0.0 0.0
1988 5530 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References