X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415040609002

Well Details

Well ID: 0415040609002
Loading map...
Location: 00/09-06-041-04W5/2
Location Alias: 00/09-06-41-04 W5M
Location Alias 2: 00/09-06-041-04 W5/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 04
Section: 06
County/Municipality: Clearwater County
Well Name: NNR GILBY 9-6-41-4
Operator Name: New North Resources Ltd.
License Number: 0359546
License Date: 2006-06-27
License Status: Issued
Spud Date: 2006-07-02
Final Drill Date: 2006-07-04
Well Total Depth: 1086.00 m
Surface Hole Latitude: 52.504336
Surface Hole Longitude: -114.557980

For data sources see[1][2]

Well History

Date Event
2006-06-27 Obtained License
2006-07-03 Surface Casing Operation Performed
2006-07-04 Finished Drilling
2006-07-04 Well Log Performed
2006-07-04 Well Mode changed to Drilled and Cased
2006-07-05 Production Casing Operation Performed
2006-07-05 Rig Released
2006-07-14 Well Fluid changed to Gas
2006-07-14 Well Mode changed to Testing
2006-07-15 Perforation Treatment Performed - Jet Perforation
2006-07-15 Well Log Performed
2006-07-18 Perforation Treatment Performed - Fractured
2006-07-20 Well Log Performed
2006-09-25 Well Began Production
2006-09-25 Well Fluid changed to Gas
2006-09-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-07-15 Perforation 1009.00 1010.00 17
2006-07-15 Perforation 587.00 588.00 17
2006-07-18 Fracture 1009.00 1010.00 0
2006-07-18 Fracture 883.50 884.50 0
2006-07-18 Fracture 837.50 838.50 0
2006-07-18 Fracture 827.50 828.50 0
2006-07-18 Fracture 818.00 819.00 0
2006-07-18 Fracture 807.00 808.00 0
2006-07-18 Fracture 728.00 729.00 0
2006-07-18 Fracture 639.50 640.00 0
2006-07-18 Fracture 608.00 609.00 0
2006-07-15 Perforation 883.50 884.50 17
2006-07-18 Fracture 587.00 588.00 0
2006-07-15 Perforation 837.50 838.50 17
2006-07-15 Perforation 827.50 828.50 17
2006-07-15 Perforation 818.00 819.00 17
2006-07-15 Perforation 807.00 808.00 17
2006-07-15 Perforation 728.00 729.00 17
2006-07-15 Perforation 639.50 640.00 17
2006-07-15 Perforation 608.00 609.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 1942 0.0 0.0 0.0
2007 8309 0.0 0.0 0.0
2008 8490 0.0 0.0 0.0
2009 8662 0.0 0.0 0.0
2010 8401 0.0 0.0 0.0
2011 8008 0.0 0.0 0.0
2012 8461 0.0 0.0 0.0
2013 8234 0.0 0.0 0.0
2014 8135 0.0 0.0 0.0
2015 5495 0.0 0.0 0.0
2016 8568 0.0 0.0 0.0
2017 8256 0.0 0.0 0.0
2018 6630 0.0 0.0 0.0
2019 5947 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References