X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415050704030

Well Details

Well ID: 0415050704030
Loading map...
Location: 03/04-07-041-05W5/0
Location Alias: 03/04-07-41-05 W5M
Location Alias 2: 03/04-07-041-05 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 05
Section: 07
County/Municipality: Clearwater County
Well Name: YANGARRA 103 WILLGR 4-7-41-5
Operator Name: Yangarra Resources Corp.
License Number: 0480049
License Date: 2016-08-05
License Status: Issued
Spud Date: 2016-08-17
Final Drill Date: 2016-09-01
Well Total Depth: 4515.00 m
Surface Hole Latitude: 52.534528
Surface Hole Longitude: -114.714761

For data sources see[1][2]

Well History

Date Event
2016-08-05 Obtained License
2016-08-19 Surface Casing Operation Performed
2016-08-22 Direction Drilling Operation Performed - Deviate
2016-08-23 Direction Drilling Operation Performed - Horizontal
2016-09-01 Finished Drilling
2016-09-01 Well Log Performed
2016-09-01 Well Mode changed to Drilled and Cased
2016-09-03 Production Casing Operation Performed
2016-09-03 Rig Released
2016-09-15 Well Log Performed
2016-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-23 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-05 Well Began Production
2016-10-05 Well Fluid changed to Crude Oil
2016-10-05 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-08-17 Trinidad Drilling Ltd. 53 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-08-22 1613.50 Deviate (5 - 79 degrees)
2016-08-23 2032.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-09-21 Multi-Stage Fracture 4486.10 4486.20 0
2016-09-22 Multi-Stage Fracture 4176.70 4176.80 0
2016-09-22 Multi-Stage Fracture 4137.00 4137.10 0
2016-09-22 Multi-Stage Fracture 4109.00 4109.10 0
2016-09-22 Multi-Stage Fracture 4069.10 4069.20 0
2016-09-22 Multi-Stage Fracture 4041.40 4041.50 0
2016-09-22 Multi-Stage Fracture 4001.50 4001.60 0
2016-09-22 Multi-Stage Fracture 3973.50 3973.60 0
2016-09-22 Multi-Stage Fracture 3933.50 3933.60 0
2016-09-22 Multi-Stage Fracture 3905.40 3905.50 0
2016-09-22 Multi-Stage Fracture 3865.60 3865.70 0
2016-09-22 Multi-Stage Fracture 4448.60 4448.70 0
2016-09-22 Multi-Stage Fracture 3837.60 3837.70 0
2016-09-22 Multi-Stage Fracture 3798.20 3798.30 0
2016-09-22 Multi-Stage Fracture 3770.10 3770.20 0
2016-09-22 Multi-Stage Fracture 3730.40 3730.50 0
2016-09-22 Multi-Stage Fracture 3702.30 3702.40 0
2016-09-22 Multi-Stage Fracture 3662.50 3662.60 0
2016-09-22 Multi-Stage Fracture 3634.50 3634.60 0
2016-09-22 Multi-Stage Fracture 3595.00 3595.10 0
2016-09-22 Multi-Stage Fracture 3566.80 3566.90 0
2016-09-22 Multi-Stage Fracture 3527.00 3527.10 0
2016-09-22 Multi-Stage Fracture 4408.70 4408.80 0
2016-09-22 Multi-Stage Fracture 3498.80 3498.90 0
2016-09-22 Multi-Stage Fracture 3459.30 3459.40 0
2016-09-22 Multi-Stage Fracture 3431.20 3431.30 0
2016-09-23 Multi-Stage Fracture 3391.50 3391.60 0
2016-09-23 Multi-Stage Fracture 3363.40 3363.50 0
2016-09-23 Multi-Stage Fracture 3323.50 3323.60 0
2016-09-23 Multi-Stage Fracture 3295.30 3295.40 0
2016-09-23 Multi-Stage Fracture 3256.20 3256.30 0
2016-09-23 Multi-Stage Fracture 3228.10 3228.20 0
2016-09-23 Multi-Stage Fracture 3188.50 3188.60 0
2016-09-22 Multi-Stage Fracture 4380.50 4380.60 0
2016-09-23 Multi-Stage Fracture 3148.70 3148.80 0
2016-09-23 Multi-Stage Fracture 3120.70 3120.80 0
2016-09-23 Multi-Stage Fracture 3080.90 3081.00 0
2016-09-23 Multi-Stage Fracture 3052.70 3052.80 0
2016-09-23 Multi-Stage Fracture 3012.90 3013.00 0
2016-09-23 Multi-Stage Fracture 2984.70 2984.80 0
2016-09-23 Multi-Stage Fracture 2944.80 2944.90 0
2016-09-23 Multi-Stage Fracture 2905.10 2905.20 0
2016-09-23 Multi-Stage Fracture 2865.30 2865.40 0
2016-09-23 Multi-Stage Fracture 2837.20 2837.30 0
2016-09-22 Multi-Stage Fracture 4340.60 4340.70 0
2016-09-23 Multi-Stage Fracture 2797.40 2797.50 0
2016-09-23 Multi-Stage Fracture 2769.30 2769.40 0
2016-09-23 Multi-Stage Fracture 2729.50 2729.60 0
2016-09-23 Multi-Stage Fracture 2701.60 2701.70 0
2016-09-23 Multi-Stage Fracture 2662.00 2662.10 0
2016-09-23 Multi-Stage Fracture 2633.80 2633.90 0
2016-09-23 Multi-Stage Fracture 2593.90 2594.00 0
2016-09-23 Multi-Stage Fracture 2565.70 2565.80 0
2016-09-23 Multi-Stage Fracture 2525.90 2526.00 0
2016-09-23 Multi-Stage Fracture 2497.80 2497.90 0
2016-09-22 Multi-Stage Fracture 4312.40 4312.50 0
2016-09-23 Multi-Stage Fracture 2457.90 2458.00 0
2016-09-23 Multi-Stage Fracture 2429.70 2429.80 0
2016-09-23 Multi-Stage Fracture 2389.90 2390.00 0
2016-09-23 Multi-Stage Fracture 2361.60 2361.70 0
2016-09-23 Multi-Stage Fracture 2321.80 2321.90 0
2016-09-23 Multi-Stage Fracture 2293.60 2293.70 0
2016-09-23 Multi-Stage Fracture 2253.80 2253.90 0
2016-09-24 Multi-Stage Fracture 2225.70 2225.80 0
2016-09-24 Multi-Stage Fracture 2185.80 2185.90 0
2016-09-24 Multi-Stage Fracture 2157.70 2157.80 0
2016-09-22 Multi-Stage Fracture 4272.50 4272.60 0
2016-09-24 Multi-Stage Fracture 2117.90 2118.00 0
2016-09-24 Multi-Stage Fracture 2090.00 2090.10 0
2016-09-22 Multi-Stage Fracture 4244.60 4244.70 0
2016-09-22 Multi-Stage Fracture 4204.90 4205.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-09-21 2016-09-24 1,927 5,905 N/A
2 2016-09-21 2016-09-21 1,927 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.9753 N/A
Sand (20/40) Canyon Technical Services Aluminum Oxide 1344-28-1 100 10.4945 N/A
Crystalline silica. quartz 14808-60-7 100 10.4945 N/A
Iron Oxide 1309-37-1 100 10.4945 N/A
Titanium Oxide 13463-67-7 100 10.4945 N/A
Sand (30/50) Canyon Technical Services Aluminum Oxide 1344-28-1 100 5.2281 N/A
Crystalline silica. quartz 14808-60-7 100 5.2281 N/A
Iron Oxide 1309-37-1 100 5.2281 N/A
Titanium Oxide 13463-67-7 100 5.2281 N/A
Chemcide PT Canyon Technical Services Bactericide/Biocide Methyl Alcohol 67-56-1 100 0.0278 N/A
N-Coco Alkyltrimethylenediamine diacetates 61791-64-8 100 0.0278 N/A
CAN-1911 Clay Stabilizer Canyon Technical Services Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.0714 N/A
Water 7732-18-5 100 0.0714 N/A
CAN-2413 Non-emulsifier Canyon Technical Services Demulsifier Isopropyl Alcohol 67-63-0 100 0.085 N/A
Methanol 67-56-1 100 0.085 N/A
Non-hazardous base ingredient(s) Not Available 100 0.085 N/A
Sulfonic Acids (Petroleum) 61789-85-3 100 0.085 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Technical Services Gelling Agent Ammonium Chloride 12125-02-9 100 0.1144 N/A
Hydrotreated Kerosene 64742-47-8 100 0.1144 N/A
Water 7732-18-5 100 0.1144 N/A
2 Sand (40/70) Canyon Technical Services Aluminum Oxide 1344-28-1 100 0.2267 N/A
Crystalline silica. quartz 14808-60-7 100 0.2267 N/A
Iron Oxide 1309-37-1 100 0.2268 N/A
Titanium Oxide 13463-67-7 100 0.2266 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-09-21 2016-09-24 Surface Water - Runoff 5734

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2020 0.0 0.0 0.0
2017 8583 0.0 0.0 0.0
2018 7630 0.0 0.0 0.0
2019 6782 0.0 0.0 0.0
2020 2080 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-04 No Incident Encountered 0.00 0.00
2016-09-29 No Incident Encountered 0.00 0.00

For data sources see[10]

References