If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415061001000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.525688,"lon":-114.77515,"icon":""}]} |
Location: 00/01-10-041-06W5/0 | |
Location Alias: 00/01-10-41-06 W5M | |
Location Alias 2: 00/01-10-041-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 06 | |
Section: 10 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ WILLGR 1-10-41-6 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0459950 | |
License Date: 2013-10-09 | |
License Status: Suspension | |
Spud Date: 2013-11-18 | |
Final Drill Date: 2013-11-27 | |
Well Total Depth: 3519.80 m | |
Surface Hole Latitude: 52.525688 | |
Surface Hole Longitude: -114.775150 |
Date | Event |
---|---|
2013-10-09 | Obtained License |
2013-11-18 | Well Log Performed |
2013-11-20 | Surface Casing Operation Performed |
2013-11-22 | Direction Drilling Operation Performed - Deviate |
2013-11-23 | Direction Drilling Operation Performed - Horizontal |
2013-11-27 | Finished Drilling |
2013-11-27 | Well Log Performed |
2013-11-27 | Well Mode changed to Drilled and Cased |
2013-11-28 | Perforation Treatment Performed - Open-Hole Completion |
2013-11-28 | Production Casing Operation Performed |
2013-11-29 | Rig Released |
2013-11-29 | Well Log Performed |
2013-12-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-12-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-12-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-12-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-01-10 | Well Began Production |
2014-01-10 | Well Fluid changed to Crude Oil |
2014-01-10 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-11-18 | Trinidad Drilling Ltd. | 53 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-11-22 | 1612.80 | Deviate (5 - 79 degrees) |
2013-11-23 | 2098.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-11-28 | Open Hole/Barefoot Completion | 3514.00 | 3519.80 | 0 |
2013-12-29 | Multi-Stage Fracture | 2903.70 | 2904.30 | 0 |
2013-12-29 | Multi-Stage Fracture | 2832.00 | 2832.60 | 0 |
2013-12-29 | Multi-Stage Fracture | 2760.30 | 2760.90 | 0 |
2013-12-29 | Multi-Stage Fracture | 2688.70 | 2689.20 | 0 |
2013-12-29 | Multi-Stage Fracture | 2616.90 | 2617.50 | 0 |
2013-12-29 | Multi-Stage Fracture | 2545.30 | 2545.80 | 0 |
2013-12-29 | Multi-Stage Fracture | 2461.90 | 2462.50 | 0 |
2013-12-29 | Multi-Stage Fracture | 2378.50 | 2379.10 | 0 |
2013-12-29 | Multi-Stage Fracture | 2295.00 | 2295.60 | 0 |
2013-12-29 | Multi-Stage Fracture | 2211.60 | 2212.20 | 0 |
2013-12-21 | Multi-Stage Fracture | 3489.50 | 3489.90 | 0 |
2013-12-22 | Multi-Stage Fracture | 3405.40 | 3405.90 | 0 |
2013-12-22 | Multi-Stage Fracture | 3333.70 | 3334.30 | 0 |
2013-12-28 | Multi-Stage Fracture | 3262.00 | 3262.60 | 0 |
2013-12-28 | Multi-Stage Fracture | 3190.30 | 3190.90 | 0 |
2013-12-29 | Multi-Stage Fracture | 3118.70 | 3119.30 | 0 |
2013-12-29 | Multi-Stage Fracture | 3047.00 | 3047.60 | 0 |
2013-12-29 | Multi-Stage Fracture | 2975.40 | 2975.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-12-21 | 2013-12-29 | 1,938 | 2,329 | N/A |
2 | 2013-12-29 | 2013-12-29 | 1,938 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 84.9944 | N/A | |||
Sand (30/50) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 10.356 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 10.356 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 10.356 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 10.3559 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0163 | N/A | |
Water | 7732-18-5 | 100 | 0.0163 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.0754 | N/A | |
Water | 7732-18-5 | 100 | 0.0754 | N/A | ||||
Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 3.9746 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 3.9746 | N/A | ||||
CAN-2056 Gellant (G50 Microtox EC50) | Canyon | Gelling Agent | Ammonium Chloride | 12125-02-9 | 100 | 0.0944 | N/A | |
Hydrotreated Kerosene | 64742-47-8 | 100 | 0.0944 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0944 | N/A | ||||
CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.0824 | N/A | |
Water | 7732-18-5 | 100 | 0.0824 | N/A | ||||
2 | RCS Pearl (20/40) | Canyon | Crystalline silica. quartz | 14808-60-7 | 100 | 2.952 | N/A | |
Polyurethane resin | 67700-43-0 | 100 | 2.9521 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-12-18 | 2013-12-19 | Surface Water - Runoff | 2000 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 8127 | 0.0 | 0.0 | 0.0 |
2015 | 1680 | 0.0 | 0.0 | 0.0 |
2016 | 1334 | 0.0 | 0.0 | 0.0 |
2017 | 6351 | 0.0 | 0.0 | 0.0 |
2018 | 6859 | 0.0 | 0.0 | 0.0 |
2019 | 6438 | 0.0 | 0.0 | 0.0 |
2020 | 554 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-11-29 | No Incident Encountered | 0.00 | 0.00 |
2014-01-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]