If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415061416020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.533966,"lon":-114.782281,"icon":""}]} |
Location: 02/16-14-041-06W5/0 | |
Location Alias: 02/16-14-41-06 W5M | |
Location Alias 2: 02/16-14-041-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 06 | |
Section: 14 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ 102 WILLGR 16-14-41-6 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0491346 | |
License Date: 2018-10-09 | |
License Status: Issued | |
Spud Date: 2018-10-30 | |
Final Drill Date: 2018-11-07 | |
Well Total Depth: 4340.00 m | |
Surface Hole Latitude: 52.533966 | |
Surface Hole Longitude: -114.782281 |
Date | Event |
---|---|
2018-10-09 | Obtained License |
2018-11-01 | Surface Casing Operation Performed |
2018-11-03 | Direction Drilling Operation Performed - Deviate |
2018-11-04 | Direction Drilling Operation Performed - Horizontal |
2018-11-07 | Finished Drilling |
2018-11-07 | Production Casing Operation Performed |
2018-11-07 | Well Log Performed |
2018-11-07 | Well Mode changed to Drilled and Cased |
2018-11-10 | Rig Released |
2018-12-19 | Well Log Performed |
2019-01-01 | Well Began Production |
2019-01-01 | Well Fluid changed to Crude Oil |
2019-01-01 | Well Mode changed to Flowing |
2019-01-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-16 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-10-30 | Stampede Drilling A Division Of Matrix Energy Technologi | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-11-03 | 1631.60 | Deviate (5 - 79 degrees) |
2018-11-04 | 2101.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-01-14 | Multi-Stage Fracture | 4292.30 | 4292.40 | 0 |
2019-01-15 | Multi-Stage Fracture | 4134.20 | 4134.30 | 0 |
2019-01-16 | Multi-Stage Fracture | 2558.60 | 2558.70 | 0 |
2019-01-16 | Multi-Stage Fracture | 2541.40 | 2541.50 | 0 |
2019-01-16 | Multi-Stage Fracture | 2524.10 | 2524.20 | 0 |
2019-01-16 | Multi-Stage Fracture | 2506.50 | 2506.60 | 0 |
2019-01-16 | Multi-Stage Fracture | 2489.10 | 2489.20 | 0 |
2019-01-16 | Multi-Stage Fracture | 2471.50 | 2471.60 | 0 |
2019-01-16 | Multi-Stage Fracture | 2454.00 | 2454.10 | 0 |
2019-01-16 | Multi-Stage Fracture | 2436.50 | 2436.60 | 0 |
2019-01-16 | Multi-Stage Fracture | 2418.80 | 2418.90 | 0 |
2019-01-16 | Multi-Stage Fracture | 2401.20 | 2401.30 | 0 |
2019-01-15 | Multi-Stage Fracture | 4116.80 | 4116.90 | 0 |
2019-01-16 | Multi-Stage Fracture | 2383.60 | 2383.70 | 0 |
2019-01-16 | Multi-Stage Fracture | 2366.20 | 2366.30 | 0 |
2019-01-16 | Multi-Stage Fracture | 2349.10 | 2349.20 | 0 |
2019-01-16 | Multi-Stage Fracture | 2331.60 | 2331.70 | 0 |
2019-01-16 | Multi-Stage Fracture | 2314.10 | 2314.20 | 0 |
2019-01-16 | Multi-Stage Fracture | 2296.80 | 2296.90 | 0 |
2019-01-16 | Multi-Stage Fracture | 2279.40 | 2279.50 | 0 |
2019-01-16 | Multi-Stage Fracture | 2261.80 | 2261.90 | 0 |
2019-01-16 | Multi-Stage Fracture | 2244.40 | 2244.50 | 0 |
2019-01-16 | Multi-Stage Fracture | 2227.10 | 2227.20 | 0 |
2019-01-15 | Multi-Stage Fracture | 4099.20 | 4099.30 | 0 |
2019-01-16 | Multi-Stage Fracture | 2209.60 | 2209.70 | 0 |
2019-01-16 | Multi-Stage Fracture | 2192.10 | 2192.20 | 0 |
2019-01-16 | Multi-Stage Fracture | 2174.90 | 2175.00 | 0 |
2019-01-16 | Multi-Stage Fracture | 2157.40 | 2157.50 | 0 |
2019-01-16 | Multi-Stage Fracture | 2140.10 | 2140.20 | 0 |
2019-01-16 | Multi-Stage Fracture | 2122.60 | 2122.70 | 0 |
2019-01-16 | Multi-Stage Fracture | 2105.00 | 2105.10 | 0 |
2019-01-16 | Multi-Stage Fracture | 2087.50 | 2087.60 | 0 |
2019-01-15 | Multi-Stage Fracture | 4081.50 | 4081.60 | 0 |
2019-01-15 | Multi-Stage Fracture | 4064.00 | 4064.10 | 0 |
2019-01-15 | Multi-Stage Fracture | 4046.40 | 4046.50 | 0 |
2019-01-15 | Multi-Stage Fracture | 4029.00 | 4029.10 | 0 |
2019-01-15 | Multi-Stage Fracture | 4011.60 | 4011.70 | 0 |
2019-01-15 | Multi-Stage Fracture | 3994.00 | 3994.10 | 0 |
2019-01-15 | Multi-Stage Fracture | 3976.20 | 3976.30 | 0 |
2019-01-14 | Multi-Stage Fracture | 4274.80 | 4274.90 | 0 |
2019-01-15 | Multi-Stage Fracture | 3958.50 | 3958.60 | 0 |
2019-01-15 | Multi-Stage Fracture | 3941.00 | 3941.10 | 0 |
2019-01-15 | Multi-Stage Fracture | 3923.80 | 3923.90 | 0 |
2019-01-15 | Multi-Stage Fracture | 3906.10 | 3906.20 | 0 |
2019-01-15 | Multi-Stage Fracture | 3888.40 | 3888.50 | 0 |
2019-01-15 | Multi-Stage Fracture | 3870.80 | 3870.90 | 0 |
2019-01-15 | Multi-Stage Fracture | 3853.50 | 3853.60 | 0 |
2019-01-15 | Multi-Stage Fracture | 3836.00 | 3836.10 | 0 |
2019-01-15 | Multi-Stage Fracture | 3818.40 | 3818.50 | 0 |
2019-01-15 | Multi-Stage Fracture | 3800.90 | 3801.00 | 0 |
2019-01-14 | Multi-Stage Fracture | 4257.60 | 4257.70 | 0 |
2019-01-15 | Multi-Stage Fracture | 3783.50 | 3783.60 | 0 |
2019-01-15 | Multi-Stage Fracture | 3766.10 | 3766.20 | 0 |
2019-01-15 | Multi-Stage Fracture | 3748.60 | 3748.70 | 0 |
2019-01-15 | Multi-Stage Fracture | 3731.30 | 3731.40 | 0 |
2019-01-15 | Multi-Stage Fracture | 3713.70 | 3713.80 | 0 |
2019-01-15 | Multi-Stage Fracture | 3696.50 | 3696.60 | 0 |
2019-01-15 | Multi-Stage Fracture | 3678.80 | 3678.90 | 0 |
2019-01-15 | Multi-Stage Fracture | 3661.40 | 3661.50 | 0 |
2019-01-15 | Multi-Stage Fracture | 3644.00 | 3644.10 | 0 |
2019-01-15 | Multi-Stage Fracture | 3626.70 | 3626.80 | 0 |
2019-01-14 | Multi-Stage Fracture | 4239.80 | 4239.90 | 0 |
2019-01-15 | Multi-Stage Fracture | 3609.00 | 3609.10 | 0 |
2019-01-15 | Multi-Stage Fracture | 3591.60 | 3591.70 | 0 |
2019-01-15 | Multi-Stage Fracture | 3574.30 | 3574.40 | 0 |
2019-01-15 | Multi-Stage Fracture | 3556.90 | 3557.00 | 0 |
2019-01-15 | Multi-Stage Fracture | 3539.30 | 3539.40 | 0 |
2019-01-15 | Multi-Stage Fracture | 3521.90 | 3522.00 | 0 |
2019-01-15 | Multi-Stage Fracture | 3504.20 | 3504.30 | 0 |
2019-01-15 | Multi-Stage Fracture | 3486.90 | 3487.00 | 0 |
2019-01-15 | Multi-Stage Fracture | 3469.40 | 3469.50 | 0 |
2019-01-15 | Multi-Stage Fracture | 3451.80 | 3451.90 | 0 |
2019-01-14 | Multi-Stage Fracture | 4222.20 | 4222.30 | 0 |
2019-01-15 | Multi-Stage Fracture | 3434.30 | 3434.40 | 0 |
2019-01-15 | Multi-Stage Fracture | 3417.00 | 3417.10 | 0 |
2019-01-15 | Multi-Stage Fracture | 3399.40 | 3399.50 | 0 |
2019-01-15 | Multi-Stage Fracture | 3381.90 | 3382.00 | 0 |
2019-01-15 | Multi-Stage Fracture | 3364.40 | 3364.50 | 0 |
2019-01-15 | Multi-Stage Fracture | 3346.70 | 3346.80 | 0 |
2019-01-15 | Multi-Stage Fracture | 3329.10 | 3329.20 | 0 |
2019-01-15 | Multi-Stage Fracture | 3312.00 | 3312.10 | 0 |
2019-01-15 | Multi-Stage Fracture | 3294.50 | 3294.60 | 0 |
2019-01-15 | Multi-Stage Fracture | 3277.00 | 3277.10 | 0 |
2019-01-14 | Multi-Stage Fracture | 4204.40 | 4204.50 | 0 |
2019-01-15 | Multi-Stage Fracture | 3259.40 | 3259.50 | 0 |
2019-01-15 | Multi-Stage Fracture | 3241.70 | 3241.80 | 0 |
2019-01-15 | Multi-Stage Fracture | 3224.10 | 3224.20 | 0 |
2019-01-15 | Multi-Stage Fracture | 3206.30 | 3206.40 | 0 |
2019-01-15 | Multi-Stage Fracture | 3188.80 | 3188.90 | 0 |
2019-01-15 | Multi-Stage Fracture | 3171.40 | 3171.50 | 0 |
2019-01-15 | Multi-Stage Fracture | 3154.00 | 3154.10 | 0 |
2019-01-15 | Multi-Stage Fracture | 3136.60 | 3136.70 | 0 |
2019-01-15 | Multi-Stage Fracture | 3119.10 | 3119.20 | 0 |
2019-01-15 | Multi-Stage Fracture | 3101.80 | 3101.90 | 0 |
2019-01-14 | Multi-Stage Fracture | 4186.70 | 4186.80 | 0 |
2019-01-15 | Multi-Stage Fracture | 3084.30 | 3084.40 | 0 |
2019-01-15 | Multi-Stage Fracture | 3066.80 | 3066.90 | 0 |
2019-01-15 | Multi-Stage Fracture | 3049.20 | 3049.30 | 0 |
2019-01-16 | Multi-Stage Fracture | 3031.60 | 3031.70 | 0 |
2019-01-16 | Multi-Stage Fracture | 3014.10 | 3014.20 | 0 |
2019-01-16 | Multi-Stage Fracture | 2996.60 | 2996.70 | 0 |
2019-01-16 | Multi-Stage Fracture | 2979.10 | 2979.20 | 0 |
2019-01-16 | Multi-Stage Fracture | 2961.50 | 2961.60 | 0 |
2019-01-16 | Multi-Stage Fracture | 2944.10 | 2944.20 | 0 |
2019-01-16 | Multi-Stage Fracture | 2926.70 | 2926.80 | 0 |
2019-01-14 | Multi-Stage Fracture | 4168.40 | 4169.50 | 0 |
2019-01-16 | Multi-Stage Fracture | 2909.00 | 2909.10 | 0 |
2019-01-16 | Multi-Stage Fracture | 2891.50 | 2891.60 | 0 |
2019-01-16 | Multi-Stage Fracture | 2873.90 | 2874.00 | 0 |
2019-01-16 | Multi-Stage Fracture | 2856.50 | 2856.60 | 0 |
2019-01-16 | Multi-Stage Fracture | 2839.00 | 2839.10 | 0 |
2019-01-16 | Multi-Stage Fracture | 2821.40 | 2821.50 | 0 |
2019-01-16 | Multi-Stage Fracture | 2803.80 | 2803.90 | 0 |
2019-01-16 | Multi-Stage Fracture | 2786.10 | 2786.20 | 0 |
2019-01-16 | Multi-Stage Fracture | 2768.60 | 2768.70 | 0 |
2019-01-16 | Multi-Stage Fracture | 2751.00 | 2751.10 | 0 |
2019-01-14 | Multi-Stage Fracture | 4151.70 | 4151.80 | 0 |
2019-01-16 | Multi-Stage Fracture | 2733.40 | 2733.50 | 0 |
2019-01-16 | Multi-Stage Fracture | 2715.90 | 2716.00 | 0 |
2019-01-16 | Multi-Stage Fracture | 2698.40 | 2698.50 | 0 |
2019-01-16 | Multi-Stage Fracture | 2680.70 | 2680.80 | 0 |
2019-01-16 | Multi-Stage Fracture | 2663.20 | 2663.30 | 0 |
2019-01-16 | Multi-Stage Fracture | 2645.70 | 2645.80 | 0 |
2019-01-16 | Multi-Stage Fracture | 2628.30 | 2628.40 | 0 |
2019-01-16 | Multi-Stage Fracture | 2611.00 | 2611.10 | 0 |
2019-01-16 | Multi-Stage Fracture | 2593.50 | 2593.60 | 0 |
2019-01-16 | Multi-Stage Fracture | 2576.10 | 2576.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-01-14 | 2019-01-16 | 1,936 | 11,265 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 93.9266 | N/A | |||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.2524 | N/A | ||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.8208 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.007 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.007 | N/A | ||||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0796 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0796 | N/A | ||||
ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0429 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0429 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0733 | N/A | |
Methanol | 67-56-1 | 100 | 0.0733 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0733 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-01-14 | 2019-01-16 | Surface Water - Runoff | 10892 |
2019-01-16 | 2019-01-16 | Surface Water - Runoff | 192 |
2019-01-15 | 2019-01-16 | Municipal Water | 939 |
2019-01-14 | 2019-01-16 | Oilfield Produced Water | 114 |
2019-01-14 | 2019-01-16 | Oilfield Produced Water | 234 |
2019-01-14 | 2019-01-16 | Oilfield Produced Water | 125 |
2019-01-15 | 2019-01-16 | Oilfield Produced Water | 98 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 7776 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-11-10 | No Incident Encountered | 0.00 | 0.00 |
2019-01-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]