If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415070904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.509943,"lon":-114.938466,"icon":""}]} |
Location: 00/04-09-041-07W5/0 | |
Location Alias: 00/04-09-41-07 W5M | |
Location Alias 2: 00/04-09-041-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 07 | |
Section: 09 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ FERRIER 4-9-41-7 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0447620 | |
License Date: 2012-08-07 | |
License Status: Issued | |
Spud Date: 2012-09-12 | |
Final Drill Date: 2012-09-22 | |
Well Total Depth: 3341.00 m | |
Surface Hole Latitude: 52.509943 | |
Surface Hole Longitude: -114.938466 |
Date | Event |
---|---|
2012-08-07 | Obtained License |
2012-09-15 | Surface Casing Operation Performed |
2012-09-16 | Direction Drilling Operation Performed - Deviate |
2012-09-18 | Well Log Performed |
2012-09-19 | Direction Drilling Operation Performed - Horizontal |
2012-09-22 | Finished Drilling |
2012-09-22 | Well Log Performed |
2012-09-22 | Well Mode changed to Drilled and Cased |
2012-09-23 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-24 | Production Casing Operation Performed |
2012-09-24 | Rig Released |
2012-09-24 | Well Log Performed |
2012-10-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-23 | Well Began Production |
2012-10-23 | Well Fluid changed to Crude Oil |
2012-10-23 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-12 | Trinidad Drilling Ltd. | 53 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-16 | 1841.20 | Deviate (5 - 79 degrees) |
2012-09-19 | 2084.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-23 | Open Hole/Barefoot Completion | 3337.00 | 3341.00 | 0 |
2012-10-19 | Multi-Stage Fracture | 2808.90 | 2809.50 | 0 |
2012-10-19 | Multi-Stage Fracture | 2750.40 | 2751.00 | 0 |
2012-10-19 | Multi-Stage Fracture | 2691.60 | 2692.20 | 0 |
2012-10-19 | Multi-Stage Fracture | 2633.00 | 2633.60 | 0 |
2012-10-19 | Multi-Stage Fracture | 2574.50 | 2575.00 | 0 |
2012-10-19 | Multi-Stage Fracture | 2515.90 | 2616.50 | 0 |
2012-10-19 | Multi-Stage Fracture | 2457.30 | 2457.80 | 0 |
2012-10-20 | Multi-Stage Fracture | 2398.50 | 2399.10 | 0 |
2012-10-20 | Multi-Stage Fracture | 2341.20 | 2341.70 | 0 |
2012-10-20 | Multi-Stage Fracture | 2282.50 | 2283.10 | 0 |
2012-10-19 | Multi-Stage Fracture | 3278.10 | 3278.60 | 0 |
2012-10-20 | Multi-Stage Fracture | 2223.90 | 2224.50 | 0 |
2012-10-20 | Multi-Stage Fracture | 2165.60 | 2166.10 | 0 |
2012-10-19 | Multi-Stage Fracture | 3219.20 | 3219.80 | 0 |
2012-10-19 | Multi-Stage Fracture | 3160.90 | 3161.50 | 0 |
2012-10-19 | Multi-Stage Fracture | 3102.30 | 3102.90 | 0 |
2012-10-19 | Multi-Stage Fracture | 3043.60 | 3044.20 | 0 |
2012-10-19 | Multi-Stage Fracture | 2985.00 | 2985.60 | 0 |
2012-10-19 | Multi-Stage Fracture | 2926.30 | 2926.90 | 0 |
2012-10-19 | Multi-Stage Fracture | 2867.50 | 2868.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1713 | 0.0 | 0.0 | 0.0 |
2013 | 8540 | 0.0 | 0.0 | 0.0 |
2014 | 7719 | 0.0 | 0.0 | 0.0 |
2015 | 3078 | 0.0 | 0.0 | 0.0 |
2016 | 8495 | 0.0 | 0.0 | 0.0 |
2017 | 8497 | 0.0 | 0.0 | 0.0 |
2018 | 7980 | 0.0 | 0.0 | 0.0 |
2019 | 7037 | 0.0 | 0.0 | 0.0 |
2020 | 2158 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-24 | No Incident Encountered | 0.00 | 0.00 |
2012-10-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]