If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415071104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.51092,"lon":-114.88793,"icon":""}]} |
Location: 00/04-11-041-07W5/0 | |
Location Alias: 00/04-11-41-07 W5M | |
Location Alias 2: 00/04-11-041-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 07 | |
Section: 11 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ WILLGR 4-11-41-7 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0436356 | |
License Date: 2011-08-26 | |
License Status: Issued | |
Spud Date: 2011-10-06 | |
Final Drill Date: 2011-10-28 | |
Well Total Depth: 3470.00 m | |
Surface Hole Latitude: 52.510920 | |
Surface Hole Longitude: -114.887930 |
Date | Event |
---|---|
2011-08-26 | Obtained License |
2011-10-09 | Surface Casing Operation Performed |
2011-10-13 | Direction Drilling Operation Performed - Horizontal |
2011-10-21 | Intermediate Casing Operation Performed |
2011-10-28 | Finished Drilling |
2011-10-28 | Well Log Performed |
2011-10-28 | Well Mode changed to Drilled and Cased |
2011-11-01 | Liner Casing Operation Performed |
2011-11-03 | Rig Released |
2011-11-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-09 | Perforation Treatment Performed - Open-Hole Completion |
2011-11-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-02-20 | Well Began Production |
2012-02-20 | Well Fluid changed to Crude Oil |
2012-02-20 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-13 | 1868.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-09 | Open Hole/Barefoot Completion | 3458.00 | 3470.00 | 0 |
2011-11-09 | Multi-Stage Fracture | 3443.70 | 3444.60 | 0 |
2011-11-10 | Multi-Stage Fracture | 3334.10 | 3335.20 | 0 |
2011-11-11 | Multi-Stage Fracture | 3224.50 | 3225.60 | 0 |
2011-11-11 | Multi-Stage Fracture | 3104.30 | 3105.40 | 0 |
2011-11-11 | Multi-Stage Fracture | 2984.70 | 2985.80 | 0 |
2011-11-16 | Acid Treatment | 2984.70 | 2985.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6823 | 0.0 | 0.0 | 0.0 |
2013 | 8692 | 0.0 | 0.0 | 0.0 |
2014 | 7976 | 0.0 | 0.0 | 0.0 |
2015 | 6147 | 0.0 | 0.0 | 0.0 |
2016 | 8543 | 0.0 | 0.0 | 0.0 |
2017 | 8659 | 0.0 | 0.0 | 0.0 |
2018 | 7633 | 0.0 | 0.0 | 0.0 |
2019 | 7448 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]